| ATCO Electric Ltd. | 2011-2012 General Tariff Application Compliance Filing For Directions Arising from AUC Decision 2011-459 | 02/02/2012 |
| ATCO Electric Ltd. | Heisler 764S Substation Expansion and 144-kV Transmission Line in the Heisler area | 02/01/2012 |
| ATCO Electric Ltd. | Heisler 764S Substation Expansion and 144-kV Transmission Line in the Heisler area | 01/02/2012 |
| ENMAX Power Corporation | Quarterly Transmission Access Charge (TAC) Deferral Account Rider Application – April 1, 2012 | 01/02/2012 |
| ATCO Electric Ltd. | 2012 Final Tariff Application | 01/02/2012 |
| ATCO Pipelines | Final Unaccounted for Gas/Fuel Rate Request for Filing Exemption | 01/02/2012 |
| Alberta Electric System Operator; ATCO Electric Ltd. | Applications for Swan River 735S and Edith Lake 739S Substations Capacity Upgrades in the Swan Hills area | 31/01/2012 |
| Alberta Electric System Operator; AltaLink Management Ltd. | Application for transmission upgrades in the Lac La Biche area | 26/01/2012 |
| Alberta Electric System Operator | Notice of filing of reliability standard - Definitions related to proposed PRC-018-AB-1 Disturbance and Monitoring Equipment Installation and Data Reporting | 25/01/2012 |
| Alberta Electric System Operator | Notice of filing of reliability standard PRC-018-AB-1 Disturbance Monitoring Equipment Installation and Data Reporting | 25/01/2012 |
| EPCOR Distribution & Transmission Inc. | 2012 Revised Distribution Access Service Interim Rates | 25/01/2012 |
| Alberta Electric System Operator; AltaLink Management Ltd. | Transmission upgrades in the Clearwater County area | 25/01/2012 |
| ATCO Electric Ltd. | Transmission line relocations in the Fort McMurray area | 20/01/2012 |
| ATCO Electric Ltd. | Fleet Telecommunication Tower in the Coronation area | 20/01/2012 |
| ATCO Electric Ltd. | Drumheller Telecommunication Tower Replacement within the west boundary of Drumheller | 20/01/2012 |
| ATCO Pipelines | 2012 Interim Revenue Requirement | 19/01/2012 |
| AltaLink Management Ltd. | Transmission Line 902L Conductor Replacement Wabamun Lake Area | 19/01/2012 |
| Alberta Electric System Operator; AltaLink Management Ltd. | Airdrie Area Transmission Reinforcement - hearing cancellation | 18/01/2012 |
| ENMAX Power Corporation | ENMAX No. 54 Substation and Interconnection Transmission Line | 17/01/2012 |
| AltaLink Management Ltd. | Athabasca Area Telecommunications Upgrade | 16/01/2012 |
| Nexen Inc. | Hand Hills Wind Power Project in Delia area | 16/01/2012 |
| Alberta Electric System Operator; ENMAX Power Corporation; AltaLink Management Ltd. | East Calgary Transmission Project/Shepard Energy Centre Interconnection | 11/01/2012 |
| Alberta Electric System Operator; AltaLink Management Ltd.; ATCO Electric Ltd. | Abee and Weasel Creek Transmission Line Project | 10/01/2012 |
| BioRefinex Canada Inc. | Biomass-to-Energy and Organic Fertilizer Facility | 03/01/2012 |