101 Street Transmission Line Relocation Project

ENMAX 101 Street Transmission Line Relocation Project

AUC has approved an application to relocate a portion of the 138-kilovolt transmission line 7.82L in southwest Calgary

Overview

The Alberta Utilities Commission has approved ENMAX Power Corporation's application to relocate a portion of transmission line 7.82L running parallel to 101 Street S.W. in Calgary. 

ENMAX Power Corporation has been approved to relocate a portion of the 138-kilovolt transmission line 7.82L. The existing line is located in the Calgary Transportation Utility Corridor and is in conflict with the construction and planned infrastructure of the West Calgary Ring Road. Due to conflicts with the West Calgary Ring Road construction and infrastructure, Alberta Transportation directed ENMAX Power Corporation to relocate certain portions of the existing line. The relocation is anticipated to be completed by January 31, 2021. 

Related Proceeding 24831 contains a separate application from ENMAX Power Corporation to relocate a portion of transmission line 7.82L that runs along 101 Street SW in Calgary. A notice of application for the Highway 8 Transmission Line Relocation Project was issued on September 6, 2019. 

Please visit the sections of the AUC website entitled Review process and Have your say for more information about the process used to assess and consider applications for electric and natural gas utility projects in Alberta.

Submissions

The eFiling System may be accessed to view the applications and the other documents the AUC considered in this proceeding and is also used to file submissions and evidence to participate in other proceedings.

To create an account, select "New account" and follow the steps to create a user ID and password. If you have any questions about how to use the system please contact us at info@auc.ab.ca or 310-4AUC.

Documents considered in this proceeding can be found in the eFiling System (which requires log in). Once you have logged in, enter 24828 in the "go to" section at the top left corner of your screen.

Have your say about a utility project has more information regarding your options for participation.

Proceeding 24828                Register

Application status: completed

Decision: 24828-D01-2020, issued February 13, 2020

 Information session: October 1, 2019



AUC contact: Laura Johnson 403-592-4388 or laura.johnson@auc.ab.ca


 ENMAX Power Corporation contacts: 

Wesley Manfro 403-514-2721 or wmanfro@enmax.com

Janene Taylor 403-514-2731 or jtaylor@enmax.com   

                 