Northwest Calgary Connector Pipeline Project

Northwest Calgary Connector Pipeline Project

The Alberta Utilities Commission is currently reviewing an application for a gas utility pipeline in northwest Calgary

Overview

The Alberta Utilities Commission is currently considering applications from ATCO Gas and Pipelines Ltd. for the Northwest Calgary Connector Pipeline Project to install approximately 14.3 kilometres of new 508-millimetre outside diameter high-pressure sweet natural gas pipeline in northwest Calgary. The pipeline will run primarily on the west side of Stoney Trail, from the existing Bearspaw Control Station to the proposed Big Hill Springs Control Station, where it ties into the existing East Calgary Lateral Pipeline. 

The pipeline is routed through the two proposed gate stations; the proposed Crowfoot Gate Station and the proposed Nolan Hill Gate Station, as shown in the map below. The map also identifies the applied-for route that will be considered in this proceeding.  

The AUC issued a notice of hearing for the Northwest Calgary Connector Pipeline Project on September 5, 2019.

24827-map.JPG

Submissions

The eFiling System should be accessed to view the applications and the other documents the AUC will be considering in this proceeding. The system is also used to file submissions and evidence to participate in the proceeding.

To create an account, select "New account" and follow the steps to create a user ID and password. If you have any questions about how to use the system please contact us at info@auc.ab.ca or 310-4AUC.

Documents being considered in this proceeding can be found in the eFiling System (which requires log in). Once you have logged in, enter 24827 in the "go to" section at the top left corner of your screen.

Have your say about a utility project has more information regarding your options for participation.

Proceeding 24827               Register

Application status: under review

Information session: October 8, 2019, starting at 7 p.m.

Location: Lynx Ridge Golf Club

 

 Hearing: February 10, 2020, starting at 9 a.m.

Location: William Andrew Grieve Hearing Room

 

Decision expected: Spring 2020

           

 AUC contact: 
 Lekan Osanyintola 403-592-4369

or lekan.osanyintola@auc.ab.ca

 

 ATCO Gas and Pipelines Ltd. contacts: 
Adam Wood 780-420-5499
or
adam.wood@atco.com

Jo-Anne Van Sickle 780-420-7562
or joanne.vansickle@atco.com

                 

Listen to a hearing

Access all regulatory documents

Anyone can access applications and proceeding information through the eFiling System.

Create a new account or log in below