RES Forty Mile Wind Project

Applications for a 400-megawatt wind power plant in the Bow Island area

‚Äč

Overview

The Alberta Utilities Commission is currently considering a project from Renewable Energy Systems Canada Inc. to construct and operate a wind power plant in the Bow Island area. If you feel you may be affected by the application submitted by Renewable Energy Systems, you can provide input by filing a submission with the AUC to review before it makes its decision.

The Alberta Utilities Commission is currently reviewing the applications and submissions received which can be accessed through the eFiling System and going to Proceeding 22966. A notice of amendments to the application was issued on December 15, 2017 asking those that wish to participate in the proceeding to provide their submissions.

The project consists of a 398.475-MW wind farm, underground collector system, operation and maintenance building and a substation. There are 115 turbines in the proposed project, each wind turbine is rated at 3.465 MW with a hub height of 101.5 metres and a turbine diameter of 132 metres. The project is located approximately five kilometres east of the town of Bow Island.

More details on the proposed project, including maps, is available from Renewable Energy Systems website: Forty Mile Wind Farm.

Find out how the Commission has dealt with certain issues in previously issued power plant decisions.

Submissions

The eFiling System should be accessed to view the applications and the other documents the AUC will be considering in this proceeding. The system is also used to file submissions and evidence to participate in the proceeding.

To create an account, select "New account" and follow the steps to create a user ID and password. If you have any questions about how to use the system please contact us at info@auc.ab.ca or 403-592-4500.

Documents being considered in this proceeding can be found in the eFiling System (which requires log in). Once you have logged in, enter 22966 in the "go to" section at the top left corner of your screen.

Have your say about a utility project has more information regarding your options for participation.

Proceeding 22966

Application status: under review

Hearing dates: June 26, 2018 at 9 a.m.to June 29, 2018 (as required)

Hearing location: Medicine Hat Lodge

 Evidence due: May 14, 2018

 

Information session: November 8, 2017

Information session location: Bow Island Legion

 

Decision expected: Fall 2018

           

AUC contact: Victor Choy
 403-592-4439 or victor.choy@auc.ab.ca

 RES Canada contact: Lucas Reindler 
514-346-3132 or luca.reindler@res-group.com  

 

eFiling System Login  Listen to a hearing

Access all regulatory documents

Anyone can access applications and proceeding information through the eFiling System.

Create a new account or log in below