Riverview Substation Project

Riverview Substation Project

The Alberta Utilities Commission is currently considering an application for a new substation and connection lines in Edmonton

Overview

The Alberta Utilities Commission is currently considering applications from EPCOR Distribution & Transmission Inc. and AltaLink Management Ltd. for the Riverview Substation Project to construct a new substation and several transmission connection lines in the south west of Edmonton.

The Alberta Electric System Operator has indicated in its needs identification document that the project is needed to serve growing electricity demand in the area.

The AUC issued a notice of application for the Riverview Substation Project on February 2, 2018. 

EPCOR Distribution & Transmission Inc. has applied to construct a new substation, designated as the Riverview Substation that would connect to transmission line 1139L via two EPCOR Distribution & Transmission Inc.-owned 70-metre slack-span connections. The substation would contain two 240/25-kilovolt (kV) transformers, four 240-kV circuit breakers, and fourteen 25-kV circuit breakers. EPCOR Distribution & Transmission Inc. also proposed to construct two fibre optic connection lines.

AltaLink Management Ltd. has applied to alter transmission line 1139L to support EPCOR Distribution & Transmission Inc.'s slack-span connections from the Riverview Substation. The existing transmission line 1139L would be split into two sections, with one designated as transmission line 1139L and the other as transmission line 1164L.

Submissions

The eFiling System should be accessed to view the applications and the other documents the AUC will be considering in this proceeding. The system is also used to file submissions and evidence to participate in the proceeding.

To create an account, select "New account" and follow the steps to create a user ID and password. If you have any questions about how to use the system please contact us at info@auc.ab.ca or 310-4AUC.

Documents being considered in this proceeding can be found in the eFiling System (which requires log in). Once you have logged in, enter 23128 in the "go to" section at the top left corner of your screen.

Have your say about a utility project has more information regarding your options for participation.

Proceeding 23128                 Register

Application status: under review

Hearing: August 21, 2018

 Hearing location: Edmonton hearing room

 

Information session: February 22, 2018 at 6 p.m.

Information session location: Hampton Inn by Hilton Edmonton South

 

Decision expected: November 2018

           

AUC contact: Abhinav Ayri
 403-592-4424 or abhinav.ayri@auc.ab.ca

 

Alberta Electric Systems Operator contact: Brenda Hill
403-539-2948 or need.applications@aeso.ca

 

EPCOR Distribution & Transmission Inc. contact: George Newton
780-412-3715 or regulatoryaffairs@epcor.com

 

AltaLink Management Ltd. contact: Michelle Lemieux
403-514-1471 or projects@altalink.ca

 

Listen to a hearing

Access all regulatory documents

Anyone can access applications and proceeding information through the eFiling System.

Create a new account or log in below