Riverview Wind Power Plant

Riverview Wind Power Plant

Applications for a 117.6-megawatt wind power project in the Pincher Creek area

Overview

The Alberta Utilities Commission has approved Enel Alberta Wind Inc. and AltaLink Management Ltd.'s application, in part, for the Riverview Wind Power Plant project. 

The application was to construct 28 4.2-megawatt (MW) turbines with a total generating capability of 117.6-MW and a collector substation in the Municipal District of Pincher Creek. 

The Commission’s approval of the project is conditional on Enel Alberta Wind Inc. implementing noise curtailments at nighttime, conducting post-construction noise surveys at receptors identified in this decision and implementing and reporting on various measures to mitigate the potential environmental and other impacts of the project. Regarding turbines 10, 11 and 12, the Commission finds that Enel’s Alberta Wind Inc. post-construction monitoring and mitigation commitments are not sufficient to adequately mitigate the environmental impacts. As a result, the Commission does not approve the construction and operation of turbines 10, 11 and 12 as currently proposed. 

On March 28, 2019, the Castleview Ridge Estates Resident Group withdrew their objection to the applications. There are no longer any parties with standing objecting to the applications, and the Commission cancelled the hearing as a result. 

Submissions

The eFiling System should be accessed to view the applications and the other documents the AUC will be considering in this proceeding. The system is also used to file submissions and evidence to participate in the proceeding.

To create an account, select "New account" and follow the steps to create a user ID and password. If you have any questions about how to use the system please contact us at info@auc.ab.ca or 310-4AUC.

Documents being considered in this proceeding can be found in the eFiling System (which requires log in). Once you have logged in, enter 2402 in the "go to" section at the top left corner of your screen.

 

 

 

Proceeding 2402                 Register

Application status: completed

Decision issued: 2402-D01-2019, issued July 16, 2019

           

AUC contact: Trevor Richards
 403-592-4469 or trevor.richards@auc.ab.ca

 

Enel Alberta Wind Inc. contact: Shaun Andrews
403-303-3221or shaun.andrews@enel.com

 

Alberta Electric Systems Operator contact: Brenda Hill
403-539-2948 or need.applications@aeso.ca

 

AltaLink Management Ltd. contact: Michelle Lemieux
403-514-1471 or projects@altalink.ca

 

Listen to a hearing

Access all regulatory documents

Anyone can access applications and proceeding information through the eFiling System.

Create a new account or log in below