Go Search

Utility Orders 
 

View RSS Feed

U2010-114Use SHIFT+ENTER to open the menu (new window).
NRGreen Power Ltd.Appendix 1 to Decision 2010-106 - Power Plant Approval for Extension of Time to Construct 8.0-MW Irma Power Plant10/03/2010
U2010-107Use SHIFT+ENTER to open the menu (new window).
Connacher Oil and Gas LimitedAppendix 2 to Decision U2010-094 - Power Plant Power Plant Approval for 15-MW Cogeneration Plant02/03/2010
U2010-106Use SHIFT+ENTER to open the menu (new window).
Connacher Oil and Gas LimitedAppendix 1 to Decision 2010-094 - Algar and Great Divide Oil Sands Industrial System Designation02/03/2010
U2010-105Use SHIFT+ENTER to open the menu (new window).
AltaLink Management Ltd.Appendix 1 to Decision 2010-090 - Time Extension to Alter Edgerton 899S Substation26/02/2010
U2010-104Use SHIFT+ENTER to open the menu (new window).
ATCO Electric Ltd.Appendix 6 to Decision 2010-095 - Connect line 7L129 to substation 526S05/03/2010
U2010-103Use SHIFT+ENTER to open the menu (new window).
ATCO Electric Ltd.Appendix 5 to Decision 2010-095 - Connect line 7L50 to substation 526S05/03/2010
U2010-102Use SHIFT+ENTER to open the menu (new window).
ATCO Electric Ltd.Appendix 4 to Decision 2010-095 - Transmission line 7L12905/03/2010
U2010-101Use SHIFT+ENTER to open the menu (new window).
ATCO Electric Ltd.Appendix 3 to Decision 2010-095 - Alter Transmission line 7L5005/03/2010
U2010-100Use SHIFT+ENTER to open the menu (new window).
AltaLink Management Ltd.Appendix 2 to Decision 2010-095 - Alter Buffalo Creek 526S substation05/03/2010
U2010-99Use SHIFT+ENTER to open the menu (new window).
Alberta Electric System OperatorAppendix 1 to Decision 2010-095 - Buffalo Creek 526S substation upgrade05/03/2010
U2010-96Use SHIFT+ENTER to open the menu (new window).
Penn West Petroleum Ltd.Appendix 1 to Decision 2010-086 - Natural Gas Engine-Driven Generator Peace River Area, Northern Sunrise County26/02/2010
U2010-95Use SHIFT+ENTER to open the menu (new window).
Cold Lake Pipeline Ltd.Appendix 1 to Decision 2010-084 - Exemption for a 3.6 MW Temporary Power Plant26/02/2010
U2010-94Use SHIFT+ENTER to open the menu (new window).
AltaLink Management Ltd.Appendix 1 to Decision 2010-091 - AESO Radio Site 9485R City of Calgary Area26/02/2010
U2010-92Use SHIFT+ENTER to open the menu (new window).
AltaLink Management Ltd.Appendix 2 to Decision 2010-099 - Substation Permit and Licence for Alteration of the Cold Creek 602S Substation04/03/2010
U2010-91Use SHIFT+ENTER to open the menu (new window).
Alberta Electric System OperatorAppendix 1 to Decision 2010-099 - Need Identification Document for Cold Creek 602S Substation04/03/2010
U2010-90Use SHIFT+ENTER to open the menu (new window).
City of Red DeerAppendix 2 to Decision 2010-079 - Distribution Service Area25/02/2010
U2010-85Use SHIFT+ENTER to open the menu (new window).
Alberta Electric System OperatorAppendix 1 to Decision 2010-075 - Need Identification Document for Edmonton Region 240-kV Transmission System Upgrades18/02/2010
U2010-84Use SHIFT+ENTER to open the menu (new window).
Husky Oil Operations LimitedAppendix 1 to Decision 2010-093 - 44-kW Power Plant to Power Oil Production Pad in Lloydminster area26/02/2010
U2010-83Use SHIFT+ENTER to open the menu (new window).
Laricina Energy Ltd.Appendix 1 to Decision 2010-068 - Power Plant Exemption12/02/2010
U2010-82Use SHIFT+ENTER to open the menu (new window).
Nexen Inc.; OPTI Canada Inc.Appendix 1 to Decision 2010-092 - Long Lake Project Industrial System Designation Amendment26/02/2010
U2010-81Use SHIFT+ENTER to open the menu (new window).
ENMAX Power CorporationAppendix 9 to Decision 2010-057 - Decommission and Salvage Approval to Salvage Transmission Line 138-1.85L12/02/2010
U2010-80Use SHIFT+ENTER to open the menu (new window).
ENMAX Power CorporationAppendix 8 to Decision 2010-057 - Decommission and Salvage Approval  to Salvage Transmission Line 138-1.84L12/02/2010
U2010-79Use SHIFT+ENTER to open the menu (new window).
ENMAX Power CorporationAppendix 7 to Decision 2010-057 - Decommission and Salvage Approval to Salvage Transmission Line 138-1.83L12/02/2010
U2010-78Use SHIFT+ENTER to open the menu (new window).
ENMAX Power CorporationAppendix 6 to Decision 2010-057 - Decommission and Salvage Approval  to Salvage Transmission Line 138-1.82L12/02/2010
U2010-77Use SHIFT+ENTER to open the menu (new window).
Alberta Health ServicesAppendix 3 to Decision 2010-060 - Power Plant Exemption for Four Emergency Power Generators Peter Lougheed Centre16/02/2010
U2010-76Use SHIFT+ENTER to open the menu (new window).
Alberta Health ServicesAppendix 2 to Decision 2010-060 - Power Plant Exemption for Three Emergency Power Generators Rockyview General Hospital16/02/2010
U2010-75Use SHIFT+ENTER to open the menu (new window).
Alberta Electric System OperatorAppendix 1 to Decision 2010-075 - Need Identification Document for Edmonton Region 240-kV Transmission System Upgrades18/02/2010
U2010-74Use SHIFT+ENTER to open the menu (new window).
TransCanada Energy Ltd.Power Plant Approval - 338 MW Saddlebrook Power Station03/02/2010
U2010-73Use SHIFT+ENTER to open the menu (new window).New
EnCana FCCL Ltd.; Cenovus FCCL Ltd.Amendment to Industrial System Designation for Foster Creek Thermal Oil Sands Project11/03/2010
U2010-72+ErrataUse SHIFT+ENTER to open the menu (new window).
Enel Alberta Wind Inc.Appendix 1 to Decision 2010-72 - Power Plant Approval for Alteration of Castle Rock Ridge Wind Farm10/02/2010
U2010-71Use SHIFT+ENTER to open the menu (new window).
TransAlta CorporationAppendix 4 to Decision 2010-067 - Transmission Line Permit and Licence to Alter Transmission Line 909L10/02/2010
U2010-70Use SHIFT+ENTER to open the menu (new window).
TransAlta CorporationAppendix 3 to Decision 2010-067 - Transmission Line Permit and Licence to Alter Transmission Line 908L10/02/2010
U2010-69Use SHIFT+ENTER to open the menu (new window).
AltaLink Management Ltd.Appendix 2 to Decision 2010-067 - Transmission Line Permit and Licence to Alter Transmission Line 909L10/02/2010
U2010-68Use SHIFT+ENTER to open the menu (new window).
AltaLink Management Ltd.Appendix 1 to Decision 2010-067 - Transmission Line Permit and Licence to Alter Transmission Line 908L10/02/2010
U2010-67Use SHIFT+ENTER to open the menu (new window).
Alberta Electric System OperatorAppendix 1 to Decision U2010-057 - Need Identification Document Approval for Replacement and Upgrade of Existing Transmission Cable Circuits12/02/2010
U2010-63Use SHIFT+ENTER to open the menu (new window).
AltaLink Management Ltd.Appendix 3 to Decision 2010-046 - Transmission Line Licence for 138-kV Transmission Line 760L From Empress 394S Substation to Amoco Empress 163S Substation and to ATCO 7L760 Northeast of the City of Medicine Hat11/02/2010
U2010-62Use SHIFT+ENTER to open the menu (new window).
AltaLink Management Ltd.Appendix 2 to Decision 2010-046 - Transmission Line Licence for 138-kV Transmission Line 658L From Chappice Lake 649S Substation to Cypress 562S Substation Northeast of the City of Medicine Hat11/02/2010
U2010-61Use SHIFT+ENTER to open the menu (new window).
AltaLink Management Ltd.Appendix 1 to Decision 2010-046 - Transmission Line Licence for 138-kV Transmission Line 674L From Medicine Hat 41S Substation to Chappice Lake 649S Substation Northeast of the City of Medicine Hat11/02/2010
U2010-60Use SHIFT+ENTER to open the menu (new window).
ENMAX Power CorporationAppendix 5 to Decision 2010-057 - Transmission Line Permit and Licence for New Transmission Line 138-1.85L12/02/2010
U2010-59Use SHIFT+ENTER to open the menu (new window).
ENMAX Power CorporationAppendix 4 to Decision 2010-057 - Transmission Line Permit and Licence for New Transmission Line 138-1.84L12/02/2010
U2010-58Use SHIFT+ENTER to open the menu (new window).
ENMAX Power CorporationAppendix 3 to Decision 2010-057 - Transmission Line Permit and Licence for New Transmission Line 138-1.83L12/02/2010
U2010-53Use SHIFT+ENTER to open the menu (new window).
AltaLink Management Ltd.Appendix to Decision 2010-042 System Control Center Communication (SCC) Upgrade existing battery backup systems22/01/2010
U2010-52Use SHIFT+ENTER to open the menu (new window).
ENMAX Power CorporationAppendix 2 to Decision 2010-057 - Transmission Line Permit and Licence for New Transmission Line 138-1.82L12/02/2010
U2010-49Use SHIFT+ENTER to open the menu (new window).
TransAlta Corporation; AltaLink Management Ltd.Appendix 2 to Decision 2010-045 - Connection Order for Castle River 239S Substation to Transmission Line 170AL10/02/2010
U2010-48Use SHIFT+ENTER to open the menu (new window).
TransAlta CorporationAppendix 1 to Decision 2010-045 - Substation Licence for Castle River 239S Substation Pincher Creek, Alberta10/02/2010
U2010-47Use SHIFT+ENTER to open the menu (new window).
EnCana FCCL Ltd.Appendix 1 to Decision 2010-037 - Industrial System Designation for Foster Creek Thermal Oil Sands26/01/2010
U2010-46Use SHIFT+ENTER to open the menu (new window).
AltaLink Management Ltd.Appendix 2 to Decision 2010-036 - Substation Permit and Licence Hardisty 377S Substation15/01/2010
U2010-45Use SHIFT+ENTER to open the menu (new window).
Alberta Electric System OperatorAppendix 1 to Decision 2010-036 - Need Identification Document Hardisty 377S substationr15/01/2010
U2010-44Use SHIFT+ENTER to open the menu (new window).
ATCO Electric Ltd.Power Plant Exemption - 20-kW Back-up Emergency Power Plant Chain Lakes Telecommunications Tower03/02/2010
U2010-43Use SHIFT+ENTER to open the menu (new window).
ATCO Electric Ltd.Power Plant Exemption - 20-kW Back-up Emergency Power Plant Wintering Hills Telecommunications Tower03/02/2010
U2010-42Use SHIFT+ENTER to open the menu (new window).
ATCO Electric Ltd.Power Plant Exemption - 20-kW Back-up Emergency Power Plant Drumheller Telecommunications Tower03/02/2010
U2010-41Use SHIFT+ENTER to open the menu (new window).
AltaLink Management Ltd.Appendix to Decision 2010-026 - Transmission Line Permit and Licence to Construct 138-kV transmission line 678L22/01/2010
U2010-40Use SHIFT+ENTER to open the menu (new window).
Capital Power Generation Services Inc.Appendix 10 to Decision 2010-100 - Connection Order for Weather Dancer Power Plant05/03/2010
U2010-39Use SHIFT+ENTER to open the menu (new window).
Capital Power Generation Services Inc.Appendix 9 to Decision 2010-100 - Connection Order for Clover Bar Landfill Power Plant05/03/2010
U2010-38Use SHIFT+ENTER to open the menu (new window).
Capital Power Generation Services Inc.Appendix 8 to Decision 2010-100 - Connection Order for Clover Bar Gas Turbine Power Plant05/03/2010
U2010-37Use SHIFT+ENTER to open the menu (new window).
Capital Power Generation Services Inc.Appendix 7 to Decision U2010-100 - Connection Order for Genesee Power Plant Unit 305/03/2010
U2010-36Use SHIFT+ENTER to open the menu (new window).
Capital Power Generation Services Inc.Appendix 6 to Decision 2010-100 - Connection Order for Genesee Power Plant Units 1 and 205/03/2010
U2010-35Use SHIFT+ENTER to open the menu (new window).
Capital Power Management Inc.; Capital Power Generation Services Inc.Appendix 5 to Decision 2010-100 - Power Plant Approval for Weather Dancer Power Plant05/03/2010
U2010-34Use SHIFT+ENTER to open the menu (new window).
Capital Power Management Inc.; Capital Power Generation Services Inc.Appendix 4 to Decision 2010-100 - Power Plant Approval for Clover Bar Landfill Gas Power Plant05/03/2010
U2010-33Use SHIFT+ENTER to open the menu (new window).
Capital Power Management Inc.; Capital Power Generation Services Inc.Appendix 3 to Decision U2010-100 - Power Plant Approval for Clover Bar Gas Turbine Power Plant05/03/2010
U2010-32Use SHIFT+ENTER to open the menu (new window).
Capital Power Management Inc.; Capital Power Generation Services Inc.Appendix 2 to Decision U2010-100 - Power Plant Approval for Genesee Power Plant Unit 305/03/2010
U2010-31Use SHIFT+ENTER to open the menu (new window).
Capital Power GP Holdings Inc; Capital Power Generation Services Inc.Appendix 1 to Decision 2010-100 - Power Plant Approval for Genesee Power Plant Units 1 and 205/03/2010
U2010-30Use SHIFT+ENTER to open the menu (new window).
TransAlta WindAppendix 2 to Decision U2010-021 Ardenville Substation15/01/2010
U2010-29Use SHIFT+ENTER to open the menu (new window).
TransAlta WindAppendix 1 to Decision U2010-021 69 MW Ardenville Wind Plant15/01/2010
U2010-28Use SHIFT+ENTER to open the menu (new window).
Venturion Natural Resources Operations LimitedAppendix to Decision 2010-017 Exemption for a 75-kW Power Plant in the Worsley Area22/01/2010
U2010-18Use SHIFT+ENTER to open the menu (new window).
ATCO Electric Ltd.Appendix 6 to Decision 2010-015 Alter Irish Creek 706S substation21/01/2010
U2010-17Use SHIFT+ENTER to open the menu (new window).
ATCO Electric Ltd.Appendix 5 to Decision 2010-015 New Lindbergh 969S substation21/01/2010
U2010-16Use SHIFT+ENTER to open the menu (new window).
ATCO Electric Ltd.Appendix 4 to Decision 2010-015 Alter Transmission Line 7L5321/01/2010
U2010-15Use SHIFT+ENTER to open the menu (new window).
ATCO Electric Ltd.Appendix 3 to Decision 2010-015 Alter a portion Transmission Line 7L53 to be re-numbered as 7L11721/01/2010
U2010-14Use SHIFT+ENTER to open the menu (new window).
ATCO Electric Ltd.Appendix 2 to Decision 2010-015 New Transmission Line 7LA5321/01/2010
U2010-13Use SHIFT+ENTER to open the menu (new window).
Alberta Electric System OperatorAppendix 1 to Decision 2010-015 Need Identification Document21/01/2010
U2010-12Use SHIFT+ENTER to open the menu (new window).
The City of LethbridgeAppendix to Decision 2010-014 - Transmission Line Permit and Licence to Rebuild 138-kV Transmission Line 813L 22/01/2010
U2010-11Use SHIFT+ENTER to open the menu (new window).
The City of LethbridgeAppendix to Decision 2010-014 - Substation Permit and Licence for MacDonald 146S Substation  Lethbridge, Alberta22/01/2010
U2010-10Use SHIFT+ENTER to open the menu (new window).
The City of LethbridgeAppendix to Decision 2010-014 - Transmission Line Permit and Licence for new 138-kV Transmission Line 667L Lethbridge, Alberta22/01/2010
U2010-9Use SHIFT+ENTER to open the menu (new window).
The City of LethbridgeAppendix to Decision 2010-014 - Transmission Line Permit and Licence to Rebuild 138-kV Transmission Line 734L22/01/2010
U2010-8Use SHIFT+ENTER to open the menu (new window).
AltaLink Management Ltd.Appendix 1 to Decision 2010-009 Time Extension Bonnie Glen 449S Substation22/01/2010
U2010-7Use SHIFT+ENTER to open the menu (new window).
ATCO Electric Ltd.Appendix 1 to Decision 2010-010 Alter McNeill 840S Substation08/01/2010
U2010-6Use SHIFT+ENTER to open the menu (new window).
ATCO Electric Ltd.Connect Transmission Line 9L32 to Imperial Oil Resources Ventures Limited’s Transmission Line L990008/01/2010
U2010-005Use SHIFT+ENTER to open the menu (new window).
Nexen Inc.; OPTI Canada Inc.Appendix 2 to Decision 2010-006 New 872S Substation15/01/2010
U2010-004Use SHIFT+ENTER to open the menu (new window).
Nexen Inc.; OPTI Canada Inc.Appendix 1 to Decision 2010-006 85-MW Cogeneration Power Plant15/01/2010
U2010-3Use SHIFT+ENTER to open the menu (new window).
ENMAX Power CorporationAlter 69-kV Transmission Line 69-13.6008/01/2010
U2010-2Use SHIFT+ENTER to open the menu (new window).
ENMAX Power CorporationAlter 138-kV Transmission Line 138-11.8108/01/2010

View RSS Feed