| NRGreen Power Ltd. | Appendix 1 to Decision 2010-106 - Power Plant Approval for Extension of Time to Construct 8.0-MW Irma Power Plant | 10/03/2010 |
| Connacher Oil and Gas Limited | Appendix 2 to Decision U2010-094 - Power Plant Power Plant Approval for 15-MW Cogeneration Plant | 02/03/2010 |
| Connacher Oil and Gas Limited | Appendix 1 to Decision 2010-094 - Algar and Great Divide Oil Sands Industrial System Designation | 02/03/2010 |
| AltaLink Management Ltd. | Appendix 1 to Decision 2010-090 - Time Extension to Alter Edgerton 899S Substation | 26/02/2010 |
| ATCO Electric Ltd. | Appendix 6 to Decision 2010-095 - Connect line 7L129 to substation 526S | 05/03/2010 |
| ATCO Electric Ltd. | Appendix 5 to Decision 2010-095 - Connect line 7L50 to substation 526S | 05/03/2010 |
| ATCO Electric Ltd. | Appendix 4 to Decision 2010-095 - Transmission line 7L129 | 05/03/2010 |
| ATCO Electric Ltd. | Appendix 3 to Decision 2010-095 - Alter Transmission line 7L50 | 05/03/2010 |
| AltaLink Management Ltd. | Appendix 2 to Decision 2010-095 - Alter Buffalo Creek 526S substation | 05/03/2010 |
| Alberta Electric System Operator | Appendix 1 to Decision 2010-095 - Buffalo Creek 526S substation upgrade | 05/03/2010 |
| Penn West Petroleum Ltd. | Appendix 1 to Decision 2010-086 - Natural Gas Engine-Driven Generator Peace River Area, Northern Sunrise County | 26/02/2010 |
| Cold Lake Pipeline Ltd. | Appendix 1 to Decision 2010-084 - Exemption for a 3.6 MW Temporary Power Plant | 26/02/2010 |
| AltaLink Management Ltd. | Appendix 1 to Decision 2010-091 - AESO Radio Site 9485R City of Calgary Area | 26/02/2010 |
| AltaLink Management Ltd. | Appendix 2 to Decision 2010-099 - Substation Permit and Licence for Alteration of the Cold Creek 602S Substation | 04/03/2010 |
| Alberta Electric System Operator | Appendix 1 to Decision 2010-099 - Need Identification Document for Cold Creek 602S Substation | 04/03/2010 |
| City of Red Deer | Appendix 2 to Decision 2010-079 - Distribution Service Area | 25/02/2010 |
| Alberta Electric System Operator | Appendix 1 to Decision 2010-075 - Need Identification Document for Edmonton Region 240-kV Transmission System Upgrades | 18/02/2010 |
| Husky Oil Operations Limited | Appendix 1 to Decision 2010-093 - 44-kW Power Plant to Power Oil Production Pad in Lloydminster area | 26/02/2010 |
| Laricina Energy Ltd. | Appendix 1 to Decision 2010-068 - Power Plant Exemption | 12/02/2010 |
| Nexen Inc.; OPTI Canada Inc. | Appendix 1 to Decision 2010-092 - Long Lake Project Industrial System Designation Amendment | 26/02/2010 |
| ENMAX Power Corporation | Appendix 9 to Decision 2010-057 - Decommission and Salvage Approval to Salvage Transmission Line 138-1.85L | 12/02/2010 |
| ENMAX Power Corporation | Appendix 8 to Decision 2010-057 - Decommission and Salvage Approval to Salvage Transmission Line 138-1.84L | 12/02/2010 |
| ENMAX Power Corporation | Appendix 7 to Decision 2010-057 - Decommission and Salvage Approval to Salvage Transmission Line 138-1.83L | 12/02/2010 |
| ENMAX Power Corporation | Appendix 6 to Decision 2010-057 - Decommission and Salvage Approval to Salvage Transmission Line 138-1.82L | 12/02/2010 |
| Alberta Health Services | Appendix 3 to Decision 2010-060 - Power Plant Exemption for Four Emergency Power Generators Peter Lougheed Centre | 16/02/2010 |
| Alberta Health Services | Appendix 2 to Decision 2010-060 - Power Plant Exemption for Three Emergency Power Generators Rockyview General Hospital | 16/02/2010 |
| Alberta Electric System Operator | Appendix 1 to Decision 2010-075 - Need Identification Document for Edmonton Region 240-kV Transmission System Upgrades | 18/02/2010 |
| TransCanada Energy Ltd. | Power Plant Approval - 338 MW Saddlebrook Power Station | 03/02/2010 |
| EnCana FCCL Ltd.; Cenovus FCCL Ltd. | Amendment to Industrial System Designation for Foster Creek Thermal Oil Sands Project | 11/03/2010 |
| Enel Alberta Wind Inc. | Appendix 1 to Decision 2010-72 - Power Plant Approval for Alteration of Castle Rock Ridge Wind Farm | 10/02/2010 |
| TransAlta Corporation | Appendix 4 to Decision 2010-067 - Transmission Line Permit and Licence to Alter Transmission Line 909L | 10/02/2010 |
| TransAlta Corporation | Appendix 3 to Decision 2010-067 - Transmission Line Permit and Licence to Alter Transmission Line 908L | 10/02/2010 |
| AltaLink Management Ltd. | Appendix 2 to Decision 2010-067 - Transmission Line Permit and Licence to Alter Transmission Line 909L | 10/02/2010 |
| AltaLink Management Ltd. | Appendix 1 to Decision 2010-067 - Transmission Line Permit and Licence to Alter Transmission Line 908L | 10/02/2010 |
| Alberta Electric System Operator | Appendix 1 to Decision U2010-057 - Need Identification Document Approval for Replacement and Upgrade of Existing Transmission Cable Circuits | 12/02/2010 |
| AltaLink Management Ltd. | Appendix 3 to Decision 2010-046 - Transmission Line Licence for 138-kV Transmission Line 760L From Empress 394S Substation to Amoco Empress 163S Substation and to ATCO 7L760 Northeast of the City of Medicine Hat | 11/02/2010 |
| AltaLink Management Ltd. | Appendix 2 to Decision 2010-046 - Transmission Line Licence for 138-kV Transmission Line 658L From Chappice Lake 649S Substation to Cypress 562S Substation Northeast of the City of Medicine Hat | 11/02/2010 |
| AltaLink Management Ltd. | Appendix 1 to Decision 2010-046 - Transmission Line Licence for 138-kV Transmission Line 674L From Medicine Hat 41S Substation to Chappice Lake 649S Substation Northeast of the City of Medicine Hat | 11/02/2010 |
| ENMAX Power Corporation | Appendix 5 to Decision 2010-057 - Transmission Line Permit and Licence for New Transmission Line 138-1.85L | 12/02/2010 |
| ENMAX Power Corporation | Appendix 4 to Decision 2010-057 - Transmission Line Permit and Licence for New Transmission Line 138-1.84L | 12/02/2010 |
| ENMAX Power Corporation | Appendix 3 to Decision 2010-057 - Transmission Line Permit and Licence for New Transmission Line 138-1.83L | 12/02/2010 |
| AltaLink Management Ltd. | Appendix to Decision 2010-042 System Control Center Communication (SCC) Upgrade existing battery backup systems | 22/01/2010 |
| ENMAX Power Corporation | Appendix 2 to Decision 2010-057 - Transmission Line Permit and Licence for New Transmission Line 138-1.82L | 12/02/2010 |
| TransAlta Corporation; AltaLink Management Ltd. | Appendix 2 to Decision 2010-045 - Connection Order for Castle River 239S Substation to Transmission Line 170AL | 10/02/2010 |
| TransAlta Corporation | Appendix 1 to Decision 2010-045 - Substation Licence for Castle River 239S Substation Pincher Creek, Alberta | 10/02/2010 |
| EnCana FCCL Ltd. | Appendix 1 to Decision 2010-037 - Industrial System Designation for Foster Creek Thermal Oil Sands | 26/01/2010 |
| AltaLink Management Ltd. | Appendix 2 to Decision 2010-036 - Substation Permit and Licence Hardisty 377S Substation | 15/01/2010 |
| Alberta Electric System Operator | Appendix 1 to Decision 2010-036 - Need Identification Document Hardisty 377S substationr | 15/01/2010 |
| ATCO Electric Ltd. | Power Plant Exemption - 20-kW Back-up Emergency Power Plant Chain Lakes Telecommunications Tower | 03/02/2010 |
| ATCO Electric Ltd. | Power Plant Exemption - 20-kW Back-up Emergency Power Plant Wintering Hills Telecommunications Tower | 03/02/2010 |
| ATCO Electric Ltd. | Power Plant Exemption - 20-kW Back-up Emergency Power Plant Drumheller Telecommunications Tower | 03/02/2010 |
| AltaLink Management Ltd. | Appendix to Decision 2010-026 - Transmission Line Permit and Licence to Construct 138-kV transmission line 678L | 22/01/2010 |
| Capital Power Generation Services Inc. | Appendix 10 to Decision 2010-100 - Connection Order for Weather Dancer Power Plant | 05/03/2010 |
| Capital Power Generation Services Inc. | Appendix 9 to Decision 2010-100 - Connection Order for Clover Bar Landfill Power Plant | 05/03/2010 |
| Capital Power Generation Services Inc. | Appendix 8 to Decision 2010-100 - Connection Order for Clover Bar Gas Turbine Power Plant | 05/03/2010 |
| Capital Power Generation Services Inc. | Appendix 7 to Decision U2010-100 - Connection Order for Genesee Power Plant Unit 3 | 05/03/2010 |
| Capital Power Generation Services Inc. | Appendix 6 to Decision 2010-100 - Connection Order for Genesee Power Plant Units 1 and 2 | 05/03/2010 |
| Capital Power Management Inc.; Capital Power Generation Services Inc. | Appendix 5 to Decision 2010-100 - Power Plant Approval for Weather Dancer Power Plant | 05/03/2010 |
| Capital Power Management Inc.; Capital Power Generation Services Inc. | Appendix 4 to Decision 2010-100 - Power Plant Approval for Clover Bar Landfill Gas Power Plant | 05/03/2010 |
| Capital Power Management Inc.; Capital Power Generation Services Inc. | Appendix 3 to Decision U2010-100 - Power Plant Approval for Clover Bar Gas Turbine Power Plant | 05/03/2010 |
| Capital Power Management Inc.; Capital Power Generation Services Inc. | Appendix 2 to Decision U2010-100 - Power Plant Approval for Genesee Power Plant Unit 3 | 05/03/2010 |
| Capital Power GP Holdings Inc; Capital Power Generation Services Inc. | Appendix 1 to Decision 2010-100 - Power Plant Approval for Genesee Power Plant Units 1 and 2 | 05/03/2010 |
| TransAlta Wind | Appendix 2 to Decision U2010-021 Ardenville Substation | 15/01/2010 |
| TransAlta Wind | Appendix 1 to Decision U2010-021 69 MW Ardenville Wind Plant | 15/01/2010 |
| Venturion Natural Resources Operations Limited | Appendix to Decision 2010-017 Exemption for a 75-kW Power Plant in the Worsley Area | 22/01/2010 |
| ATCO Electric Ltd. | Appendix 6 to Decision 2010-015 Alter Irish Creek 706S substation | 21/01/2010 |
| ATCO Electric Ltd. | Appendix 5 to Decision 2010-015 New Lindbergh 969S substation | 21/01/2010 |
| ATCO Electric Ltd. | Appendix 4 to Decision 2010-015 Alter Transmission Line 7L53 | 21/01/2010 |
| ATCO Electric Ltd. | Appendix 3 to Decision 2010-015 Alter a portion Transmission Line 7L53 to be re-numbered as 7L117 | 21/01/2010 |
| ATCO Electric Ltd. | Appendix 2 to Decision 2010-015 New Transmission Line 7LA53 | 21/01/2010 |
| Alberta Electric System Operator | Appendix 1 to Decision 2010-015 Need Identification Document | 21/01/2010 |
| The City of Lethbridge | Appendix to Decision 2010-014 - Transmission Line Permit and Licence to Rebuild 138-kV Transmission Line 813L | 22/01/2010 |
| The City of Lethbridge | Appendix to Decision 2010-014 - Substation Permit and Licence for MacDonald 146S Substation Lethbridge, Alberta | 22/01/2010 |
| The City of Lethbridge | Appendix to Decision 2010-014 - Transmission Line Permit and Licence for new 138-kV Transmission Line 667L Lethbridge, Alberta | 22/01/2010 |
| The City of Lethbridge | Appendix to Decision 2010-014 - Transmission Line Permit and Licence to Rebuild 138-kV Transmission Line 734L | 22/01/2010 |
| AltaLink Management Ltd. | Appendix 1 to Decision 2010-009 Time Extension Bonnie Glen 449S Substation | 22/01/2010 |
| ATCO Electric Ltd. | Appendix 1 to Decision 2010-010 Alter McNeill 840S Substation | 08/01/2010 |
| ATCO Electric Ltd. | Connect Transmission Line 9L32 to Imperial Oil Resources Ventures Limited’s Transmission Line L9900 | 08/01/2010 |
| Nexen Inc.; OPTI Canada Inc. | Appendix 2 to Decision 2010-006 New 872S Substation | 15/01/2010 |
| Nexen Inc.; OPTI Canada Inc. | Appendix 1 to Decision 2010-006 85-MW Cogeneration Power Plant | 15/01/2010 |
| ENMAX Power Corporation | Alter 69-kV Transmission Line 69-13.60 | 08/01/2010 |
| ENMAX Power Corporation | Alter 138-kV Transmission Line 138-11.81 | 08/01/2010 |