U2013-261Use SHIFT+ENTER to open the menu (new window).
2572Oldman 2 Wind Farm LimitedAppendix 2 to Decision 2013-184 - Windy Point 112S Substation15/05/2013
U2013-260Use SHIFT+ENTER to open the menu (new window).
2572Oldman 2 Wind Farm LimitedAppendix 1 to Decision 2013-184 - 46-MW Oldman 2 Wind Farm15/05/2013
U2013-259Use SHIFT+ENTER to open the menu (new window).
2508Alberta Electric System OperatorAppendix 1 to Decision 2013-188 - Alter Knightsbridge 216S Substation16/05/2013
U2013-257Use SHIFT+ENTER to open the menu (new window).
2508AltaLink Management Ltd.Appendix 2 to Decision 2013-188 - Alter Knightsbridge 216S Substation16/05/2013
U2013-256Use SHIFT+ENTER to open the menu (new window).
2569B. St. PierreAppendix 1 to Decision 2013-180 - 13.05-kW Solar Power Plant15/05/2013
U2013-255Use SHIFT+ENTER to open the menu (new window).
2569B. St. PierreAppendix 2 to Decision 2013-180 - Connect 13.05-kW Solar Power Plant to FortisAlberta Inc.’s distribution system15/05/2013
U2013-254Use SHIFT+ENTER to open the menu (new window).
2574ATCO Electric Ltd.Appendix 1 to DA2013-120 - Alter Indian Cabins Power Plant13/05/2013
U2013-243Use SHIFT+ENTER to open the menu (new window).
2016Shell Canada LimitedAppendix 1 to Decision 2013-176 - Connect Shell 13.8-kV Distribution Lines to AltaLink Management Ltd. Cope Creek 180S Substation14/05/2013
U2013-239Use SHIFT+ENTER to open the menu (new window).
2284AltaLink Management Ltd.Appendix 6 to Decision 2013-177 - New Transmission Line 624L10/05/2013
U2013-238Use SHIFT+ENTER to open the menu (new window).
2284AltaLink Management Ltd.Appendix 5 to Decision 2013-177 - Alter Transmission Line 893L10/05/2013
U2013-237Use SHIFT+ENTER to open the menu (new window).
2284AltaLink Management Ltd.Appendix 4 to Decision 2013-177 - New Transmission Line 994L10/05/2013
U2013-236Use SHIFT+ENTER to open the menu (new window).
2284AltaLink Management Ltd.Appendix 3 to Decision 2013-177 - Alter Transmission Line 1071L10/05/2013
U2013-235Use SHIFT+ENTER to open the menu (new window).
2284AltaLink Management Ltd.Appendix 2 to Decision 2013-177 - New Fidler 312S Substation10/05/2013
U2013-234Use SHIFT+ENTER to open the menu (new window).
2284Alberta Electric System OperatorAppendix 1 to Decision 2013-177 - Fidler 312S Substation NID10/05/2013
U2013-232Use SHIFT+ENTER to open the menu (new window).
2169AltaLink Management Ltd.Appendix 3 to Decision 2013-186 - Alter Whitecourt Industrial 364S16/05/2013
U2013-231Use SHIFT+ENTER to open the menu (new window).
2169AltaLink Management Ltd.Appendix 2 to Decision 2013-186 - Alter Whitecourt 268S Substation16/05/2013
U2013-230Use SHIFT+ENTER to open the menu (new window).
2169Alberta Electric System OperatorAppendix 1 to Decision 2013-186 - Whitecourt Industrial 364S Substation16/05/2013
U2013-229Use SHIFT+ENTER to open the menu (new window).
2172Cenovus FCCL Ltd.Appendix 1 to Decision 2013-172 - Foster Creek Thermal Oil Sands Project Industrial System Designation Amendment13/05/2013
U2013-228Use SHIFT+ENTER to open the menu (new window).
2509K. MorrisAppendix 2 to Decision 2013-170 - Connect 17.4-kW Solar Power Plant to FortisAlberta Inc.’s distribution system06/05/2013
U2013-227Use SHIFT+ENTER to open the menu (new window).
2509K. MorrisAppendix 1 to Decision 2013-170 - 17.4-kW Solar Power Plant06/05/2013
U2013-226Use SHIFT+ENTER to open the menu (new window).
2181Pteragen Canada Inc.Appendix 2 to Decision 2013-171 - New Tothill 219S Substation07/05/2013
U2013-225Use SHIFT+ENTER to open the menu (new window).
2181Pteragen Canada Inc.Appendix 1 to Decision 2013-171 - 120-MW Peace Butte Wind Power Plant07/05/2013
U2013-223Use SHIFT+ENTER to open the menu (new window).
2562AltaLink Management Ltd.Appendix 1 to DA2013-115 - Connection of AltaLink Transmission Facilities to ENMAX No. 10 Substation01/05/2013
U2013-222Use SHIFT+ENTER to open the menu (new window).
2490Genalta Power Systems Inc.Appendix 1 to Decision 2013-165 - 15-MW natural gas-fired power plant02/05/2013
U2013-221Use SHIFT+ENTER to open the menu (new window).
2490Genalta Power Systems Inc.Appendix 2 to Decision 2013-165 - Connect 15 MW natural gas-fired power plant to ATCO Electric Ltd.’s distribution system02/05/2013
U2013-220Use SHIFT+ENTER to open the menu (new window).
2551ATCO Electric Ltd.Appendix 1 to Decision 2013-189 - Alter Palisades Power Plant16/05/2013
U2013-219Use SHIFT+ENTER to open the menu (new window).
2547ATCO Electric Ltd.Appendix 1 to DA2013-113 - Decommission and Salvage a Portion of Swan River 735S Substation29/04/2013
U2013-212Use SHIFT+ENTER to open the menu (new window).
2385ATCO Electric Ltd.Appendix 4 to Decision 2013-157 - Decommission and Salvage a Segment of Transmission Line 7L5119/04/2013
U2013-211Use SHIFT+ENTER to open the menu (new window).
2384Slave Lake Pulp CorporationAppendix 2 to Decision 2013-168 - Connect power plant to ATCO Electric’s transmission system02/05/2013
U2013-210Use SHIFT+ENTER to open the menu (new window).
2384Slave Lake Pulp CorporationAppendix 1 to Decision 2013-168 - 9.06-MW Biogas Power Plant02/05/2013
U2013-209Use SHIFT+ENTER to open the menu (new window).
2475; 2476ATCO Electric Ltd.Appendix 1 to Decision 2013-167 - Alter High-Voltage Direct Current Transmission Line 13L5001/05/2013
U2013-207Use SHIFT+ENTER to open the menu (new window).
2467ATCO Electric Ltd.Appendix 1 to Decision 2013-149 - Alter Garden River Isolated Power Plant26/04/2013
U2013-202Use SHIFT+ENTER to open the menu (new window).
2293Alberta Electric System OperatorAppendix 1 to Decision 2013-150 - Algar Area 144-kV Transmission Reinforcement18/04/2013
U2013-201Use SHIFT+ENTER to open the menu (new window).
2544AltaLink Management Ltd.Appendix 3 to DA 2013-112 - Alter Transmission Line 971L30/04/2013
U2013-200Use SHIFT+ENTER to open the menu (new window).
2544AltaLink Management Ltd.Appendix 2 to DA 2013-112 - New Transmission Line 1090L30/04/2013
U2013-199Use SHIFT+ENTER to open the menu (new window).
2544AltaLink Management Ltd.Appendix 1 to DA 2013-112 - New Jackfish 698S Substation30/04/2013
U2013-198Use SHIFT+ENTER to open the menu (new window).
2385ATCO Electric Ltd.Appendix 3 to Decision 2013-157 - Alter Transmission Line 7L5119/04/2013
U2013-197Use SHIFT+ENTER to open the menu (new window).
2385ATCO Electric Ltd.Appendix 2 to Decision 2013-157 - New Buchanan Creek 927S Substation19/04/2013
U2013-196Use SHIFT+ENTER to open the menu (new window).
2385Alberta Electric System OperatorAppendix 1 to Decision 2013-157 - Buchanan Creek Substation NID19/04/2013
U2013-195Use SHIFT+ENTER to open the menu (new window).
2545EPCOR Distribution & Transmission Inc.Appendix 1 to DA2013-100 - Alter Petrolia 816S Substation17/04/2013
U2013-194Use SHIFT+ENTER to open the menu (new window).
2389AltaLink Management Ltd.Appendix 2 to Decision 2013-130 Alter Tilley 498S Substation05/04/2013
U2013-193Use SHIFT+ENTER to open the menu (new window).
2389Alberta Electric System OperatorAppendix 1 to Decision 2013-130 Tilley 498S Substation Upgrade05/04/2013
U2013-192Use SHIFT+ENTER to open the menu (new window).
2383Genalta Power Systems Inc.Appendix 2 to Decision 2013-134 Connect Power Plant to FortisAlberta Inc.’s Distribution System05/04/2013
U2013-191Use SHIFT+ENTER to open the menu (new window).
2383Genalta Power Systems Inc.Appendix 1 to Decision 2013-134 - 15-MW Gas Turbine Power Plant05/04/2013
U2013-189Use SHIFT+ENTER to open the menu (new window).
2535ATCO Electric Ltd.Appendix 3 to DA 2013-98 - Alter Transmission Line 9L5711/04/2013
U2013-188Use SHIFT+ENTER to open the menu (new window).
2535ATCO Electric Ltd.Appendix 2 to DA 2013-98 - New Transmission Line 9L1011/04/2013
U2013-187Use SHIFT+ENTER to open the menu (new window).
2535ATCO Electric Ltd.Appendix 1 to DA 2013-98 - Alter Livock 939S Substation11/04/2013
U2013-186Use SHIFT+ENTER to open the menu (new window).
2116ATCO Electric Ltd.Appendix 4 to Decision 2013-127 - Alter Livock 939S Substation04/04/2013
U2013-185Use SHIFT+ENTER to open the menu (new window).
2116ATCO Electric Ltd.Appendix 3 to Decision 2013-127 - New Transmission Line 7L14204/04/2013
U2013-184Use SHIFT+ENTER to open the menu (new window).
2116ATCO Electric Ltd.Appendix 2 to Decision 2013-127 - New Saleski 901S Substation04/04/2013
U2013-183Use SHIFT+ENTER to open the menu (new window).
2116Alberta Electric System OperatorAppendix 1 to Decision 2013-127 - Saleski Transmission Project04/04/2013
U2013-182Use SHIFT+ENTER to open the menu (new window).
1745AltaLink Management Ltd.Appendix 4 to Decision 2013-155 - Decommission and Salvage a Portion of Transmission Line 719L19/04/2013
U2013-181Use SHIFT+ENTER to open the menu (new window).
1745AltaLink Management Ltd.Appendix 3 to Decision 2013-155 - Alter Transmission Line 719L19/04/2013
U2013-180Use SHIFT+ENTER to open the menu (new window).
1745AltaLink Management Ltd.Appendix 2 to Decision 2013-155 - Alter Sundre 575S Substation19/04/2013
U2013-179Use SHIFT+ENTER to open the menu (new window).
1745Alberta Electric System OperatorAppendix 1 to Decision 2013-155 - Sundre 575S Substation19/04/2013
U2013-178Use SHIFT+ENTER to open the menu (new window).
2307ENMAX Power CorporationAppendix 2 to Decision 2013-125 - Alter ENMAX No. 21 Substation02/04/2013
U2013-177Use SHIFT+ENTER to open the menu (new window).
2307Alberta Electric System OperatorAppendix 1 to Decision 2013-125 - ENMAX No. 21 Substation Alteration02/04/2013
U2013-175Use SHIFT+ENTER to open the menu (new window).
2478Brookfield Residential (Alberta) Lp.Appendix 2 to Decision 2013-126 - Connect 59.9-kW Solar Power Plant to ENMAX Power Corporation’s Distribution System02/04/2013
U2013-174Use SHIFT+ENTER to open the menu (new window).
2478Brookfield Residential (Alberta) Lp.Appendix 1 to Decision 2013-126 - 59.9-kW Solar Power Plant02/04/2013
U2013-173Use SHIFT+ENTER to open the menu (new window).
2515AltaLink Management Ltd.Appendix 5 to DA 2013-97 - Time Extension for Altering Transmission Line 951L09/04/2013
U2013-172Use SHIFT+ENTER to open the menu (new window).
2515AltaLink Management Ltd.Appendix 4 to DA 2013-97 - Time Extension for Altering Transmission Line 944L09/04/2013
U2013-171Use SHIFT+ENTER to open the menu (new window).
2515AltaLink Management Ltd.Appendix 3 to DA 2013-97 - Time Extension for Altering Transmission Line 933L09/04/2013
U2013-170Use SHIFT+ENTER to open the menu (new window).
2515AltaLink Management Ltd.Appendix 2 to DA 2013-97 - Time Extension for Altering Ware Junction 132S Substation09/04/2013
U2013-169Use SHIFT+ENTER to open the menu (new window).
2515AltaLink Management Ltd.Appendix 1 to DA 2013-97 - Time Extension for Altering Cassils 324S Substation09/04/2013
U2013-168Use SHIFT+ENTER to open the menu (new window).
2506Manning Rural Electrification Association Ltd.Appendix 1 to Decision 2013-132 Discontinue Operation of Manning REA05/04/2013
U2013-167Use SHIFT+ENTER to open the menu (new window).
2516AltaLink Management Ltd.Appendix 4 to DA2013-99 - Alter Transmission Line 911AL11/04/2013
U2013-166Use SHIFT+ENTER to open the menu (new window).
2516AltaLink Management Ltd.Appendix 3 to DA2013-99 - Alter Transmission Line 850L11/04/2013
U2013-164Use SHIFT+ENTER to open the menu (new window).
2516AltaLink Management Ltd.Appendix 1 to DA2013-99 - Alter Transmission Line 911L11/04/2013
U2013-162Use SHIFT+ENTER to open the menu (new window).
2483AltaLink Management Ltd.Appendix 2 to Decision 2013-121 - Connection of 240-kV Connection of 240-kV ENMAX No. 65 Substation27/03/2013
U2013-161Use SHIFT+ENTER to open the menu (new window).
2483AltaLink Management Ltd.Appendix 1 to Decision 2013-121 - Connection of 240-kV Transmission Line 911L to ENMAX No. 65 Substation27/03/2013
U2013-160Use SHIFT+ENTER to open the menu (new window).
2489ATCO Electric Ltd.Appendix 1 to DA 2013-82 - Decommission and Salvage 72-kV portion of Rowley 769S Substation26/03/2013
U2013-159Use SHIFT+ENTER to open the menu (new window).
2403ENMAX Green Power Inc.Appendix 1 to Decision 2013-116 - 50-kW Solar Power Plant03/04/2013
U2013-158Use SHIFT+ENTER to open the menu (new window).
2403ENMAX Green Power Inc.Appendix 2 to Decision 2013-116 - Connect a 50-kW solar power plant to ENMAX Power Corporation’s distribution system 03/04/2013
U2013-157Use SHIFT+ENTER to open the menu (new window).
9641607099Appendix 5 to Decision 2013-122 - Oldman 2 Wind Farm Limited Temporary Connection of Transmission Line 893AL to Windy Point 112S Substation27/03/2013
U2013-151Use SHIFT+ENTER to open the menu (new window).
2197Suncor Energy Inc.Appendix 2 to Decision 2013-185 - Alter Transmission Line 29PL7-815/05/2013
U2013-150Use SHIFT+ENTER to open the menu (new window).
2197Suncor Energy Inc.Appendix 1 to Decision 2013-185 - New 29EDD-160 Substation15/05/2013
U2013-148Use SHIFT+ENTER to open the menu (new window).
964Alberta Electric System OperatorAppendix 1 to Decision 2013-122 - Oldman River Wind Energy Interconnection27/03/2013
U2013-147Use SHIFT+ENTER to open the menu (new window).
1727AltaLink Management Ltd.Appendix 5 to Decision 2013-120 - Decommission and Salvage a portion of Transmission Line 807L02/04/2013
U2013-146Use SHIFT+ENTER to open the menu (new window).
1727AltaLink Management Ltd.Appendix 4 to Decision 2013-120 - Alter Transmission Line 807L02/04/2013
U2013-145Use SHIFT+ENTER to open the menu (new window).
1727AltaLink Management Ltd.Appendix 2 to Decision 2013-120 - Alter Transmission Line 1061L02/04/2013
U2013-144Use SHIFT+ENTER to open the menu (new window).
1727AltaLink Management Ltd.Appendix 3 to Decision 2013-120 - New Transmission Line 942L02/04/2013
U2013-143Use SHIFT+ENTER to open the menu (new window).
1727AltaLink Management Ltd.Appendix 1 to Decision 2013-120 - New Bannerman 681S Substation02/04/2013
U2013-142Use SHIFT+ENTER to open the menu (new window).
2479Mustus Energy Ltd.Appendix 1 to DA2013-77 - Alter Mustus Biomass Power Plant15/03/2013
U2013-141Use SHIFT+ENTER to open the menu (new window).
964AltaLink Management Ltd.Appendix 3 to Decision 2013-122 - Transmission Line 893AL27/03/2013
U2013-140Use SHIFT+ENTER to open the menu (new window).
964AltaLink Management Ltd.Appendix 4 to Decision 2013-122 - Transmission Line 893BL27/03/2013
U2013-139Use SHIFT+ENTER to open the menu (new window).
964AltaLink Management Ltd.Appendix 2 to Decision 2013-122 - Transmission Line 893L27/03/2013
U2013-138Use SHIFT+ENTER to open the menu (new window).
2480ATCO Electric Ltd.Appendix 5 to DA2013-80 - Salvage Heisler 764S Substation Site22/03/2013
U2013-137Use SHIFT+ENTER to open the menu (new window).
2480ATCO Electric Ltd.Appendix 4 to DA2013-80 - Alter Transmission Line 6L0522/03/2013
U2013-136Use SHIFT+ENTER to open the menu (new window).
2480ATCO Electric Ltd.Appendix 3 to DA2013-80 - Alter Transmission Line 7L70122/03/2013
U2013-135Use SHIFT+ENTER to open the menu (new window).
2480ATCO Electric Ltd.Appendix 2 to DA2013-80 - New Transmission Line 7LA70122/03/2013
U2013-134Use SHIFT+ENTER to open the menu (new window).
2480ATCO Electric Ltd.Appendix 1 to DA2013-80 - Rebuild Heisler 764S Substation on a new site22/03/2013
U2013-133Use SHIFT+ENTER to open the menu (new window).
1632ATCO Electric Ltd.Appendix 4 to Decision 2013-123 - Alter Transmission Line 7L9227/03/2013
U2013-132Use SHIFT+ENTER to open the menu (new window).
1632ATCO Electric Ltd.Appendix 3 to Decision 2013-123 - New Transmission Line 7LA9227/03/2013
U2013-131Use SHIFT+ENTER to open the menu (new window).
1632ATCO Electric Ltd.Appendix 2 to Decision 2013-123 - New Watt Lake 956S Substation27/03/2013
U2013-130Use SHIFT+ENTER to open the menu (new window).
1632Alberta Electric System OperatorAppendix 1 to Decision 2013-123 - Central East Region Transmission System Development27/03/2013
U2013-129Use SHIFT+ENTER to open the menu (new window).
2252ATCO Electric Ltd.Appendix 3 to Decision 2013-083 - Decommission and salvage specified equipment at Onoway 352S substation12/03/2013
U2013-128Use SHIFT+ENTER to open the menu (new window).
2252AltaLink Management Ltd.Appendix 2 to Decision 2013-083 - Alter Onoway 352S Substation12/03/2013
U2013-127Use SHIFT+ENTER to open the menu (new window).
2252Alberta Electric System OperatorAppendix 1 to Decision 2013-083 - Need for capacity upgrade at Onoway 352S Substation12/03/2013
U2013-126Use SHIFT+ENTER to open the menu (new window).
1926ENMAX Power CorporationAppendix 2 to Decision 2013-075 - Alter ENMAX No. 47 Substation05/03/2013
U2013-125Use SHIFT+ENTER to open the menu (new window).
1926Alberta Electric System OperatorAppendix 1 to Decision 2013-075 - Transformer Addition at ENMAX No. 47 Substation05/03/2013