What is an RSS?
RSS stands for Really Simple Syndication, and it is a technology to provide a "feed" of recently updated items on the website.
To view the RSS Feed, you need to use a RSS Reader and then add the the relevant feeds to the Reader. Many modern browsers come with a RSS Reader.
Windows Internet Explorer NewsGator Firefox Other
If you have a RSS Reader, the following RSS Feeds are available for you:
Bulletins
Decisions
Licenses
Notices
Cost Orders
Utility Orders
Market Orders
Administration Fee Orders
News Releases
An aggregated RSS Feed is also available, which provides all documents from the above list as one single feed.
Recent Updates (Aggregated Feed)
Bulletin 2011-33 - - Stakeholder consultation on AUC Rule 012: Noise Control (Released: December 23, 2011) Bulletin 2011-32 - - Revisions to the Alberta Utilities Commission’s Rule 026: Rule Regarding Regulatory Account Procedures Pertaining to the Implementation of the International Financial Reporting Standards (Released: December 20, 2011) Bulletin 2011-31 - - DropChute replacement selection (Released: December 14, 2011) Bulletin 2011-29 - - AUC Rule 021: Settlement System Code Rules (Released: December 12, 2011) Bulletin 2011-30 - - AUC Rule 028: Natural Gas Settlement System Code Rules (Released: December 12, 2011) Bulletin 2011-27 - - Rule 025: Administrative Fee (Released: December 7, 2011) Bulletin 2011-28 - - Revision of Rule 019: Specified Penalties for Contravention of ISO Rules (Released: December 7, 2011) Bulletin 2011-26 - - Stakeholder consultation regarding process and procedures for disputed specified penalties and administrative penalties relating to reliability standards (Released: November 16, 2011) Bulletin 2011-25 - - Consultation on wind-power generation regulatory permitting (Released: November 10, 2011) Bulletin 2011-23 - - Stakeholder consultation on AUC Rule 021: Settlement System Code Rules (Version 2.2) (Released: October 18, 2011) Bulletin 2011-24 - - Stakeholder consultation AUC Rule 028: Natural Gas Settlement System Code Rules (Version 1.1) (Released: October 18, 2011) Bulletin 2011-22 - - Consultation on Market Surveillance Administrator (MSA) settlement applications before the Alberta Utilities Commission (Released: October 17, 2011) Bulletin 2011-21 - - Stakeholder consultation regarding process and procedure for reliability standards (Released: October 6, 2011) Bulletin 2011-20 - - Amendement to AUC Rule 001: Rules of Practice - Section 22 (Released: September 30, 2011) Bulletin 2011-19 - - Revision of AUC Rule 001: Rules of Practice – Section 22 (Released: August 22, 2011)
|
 |
|
Decision 2012-036 - ATCO Gas and Pipelines Ltd. (South) - Pipeline Split, Removal and New Construction Township 24, Range 2, West of the Fifth Meridian (Released: February 3, 2012) Decision 2012-037 - AltaGas Utilities Inc. - Termination of Natural Gas Franchise Agreement with the Village of New Sarepta (Released: February 2, 2012) Decision 2012-034 - AltaGas Holdings Inc. - Gordondale Power Plant (Released: February 2, 2012) Decision 2012-032 - ATCO Pipelines - 2011 Final Revenue Requirement, Final Rates Filing and Deferral Account (Released: January 27, 2012) Decision 2012-033 - AltaLink Management Ltd. - Cost Awards - New Westwood 422S Substation and 138-kV Transmission Line Interconnection (Released: January 27, 2012) Decision 2012-030 - Alberta Utilities Commission - Cost Awards - Generic Cost of Capital (Released: January 25, 2012) Decision 2012-031 - ATCO Utilities - 2008-2009 Evergreen Application Compliance Filing to Decision 2011-228 (Released: January 25, 2012) Decision 2012-024 - C.O. Johnson and Sons Ranches and Concerned Citizens for the Right Direction - Decision on Preliminary Question – Review and Variance of Decision 2011-355 (Released: January 24, 2012) Decision 2012-027 - TransAlta Corporation - Keephills Plant Fly Ash Disposal Project (Released: January 24, 2012) Decision 2012-029 - Heritage Wind Farm Development Inc. - Preliminary Question, Review and Variance of Decision 2011-239 (Released: January 24, 2012) Decision 2012-025 - Direct Energy Regulated Services - Cost Awards - 2011-2014 Regulated Rate Option Energy Price Setting Plan Monthly Filings for Acknowledgement – 2011 Quarter 3 (Released: January 23, 2012) Decision 2012-026 - ENMAX Energy Corporation - Cost Awards - 2011-2014 Regulated Rate Option Energy Price Setting Plan Monthly Filings for Acknowledgement 2011 Quarter 3 (Released: January 23, 2012) Decision 2012-009 - Cenovus FCCL Ltd.; ATCO Electric Ltd. - Foster Creek 1200S Substation Alterations (Released: January 23, 2012) Decision 2012-022 - Genalta Power Inc. - Power Plant at Cadotte Oil Facility (Released: January 19, 2012) Decision 2012-023 - Alberta Electric System Operator - Athabasca Area Telecommunications Upgrades Needs Identification Document (Released: January 19, 2012)
|
 |
|
Permit and Licence No. 1951 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to Decision 2012-036 - Pipeline Split, Removal and New Construction (Released: February 3, 2012) Permit and Licence No. 4764 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to DA2012-13 - Pipeline Abandonment (Released: January 25, 2012) Permit and Licence No. 18808 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to DA 2012-11 - Amendment to Permit and Licence (Released: January 23, 2012) Permit and Licence No. 2856 - ATCO Gas and Pipelines Ltd. - Appendix 1 to DA 2012-7 - Amendment to Permit and Licence (Released: January 10, 2012) Permit and Licence No. 20102 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to DA 2012-2 - Pipeline Split (Released: January 4, 2012) Permit and Licence No. 2595 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to DA 2011-150 - Amendment to Permit and Licence (Released: December 15, 2011) Permit and Licence No. 10946 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to DA 2011-148 - Pipeline Split and Record Amendment (Released: December 14, 2011) Permit and Licence No. 2856 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to DA 2011-149 - Amendment to Permit and Licence (Released: December 14, 2011) Permit and Licence No. 1828 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to Decision 2011-481 - Compressor Removal (Released: December 7, 2011) Permit and Licence No. 5029 - ATCO Gas and Pipelines Ltd. (South) - Appendix 2 to DA 2011-141 - Decrease in Maximum Operating Pressure (Released: November 29, 2011) Permit and Licence No. 3461 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to DA 2011-141 - Decrease in Maximum Operating Pressure (Released: November 29, 2011) Permit and Licence No. 20102 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to DA 2011-128: Pipeline Split, Removal and New Construction (Released: November 22, 2011) Permit and Licence No. 1973 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to DA 2011-129: Amendment to Permit and Licence (Released: November 22, 2011) Permit and Licence No. 5359 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to DA 2011-120: Pipeline Split, Removal and New Construction (Released: November 14, 2011) Permit and Licence No. 14653 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to DA 2011-122: Pipeline Abandonment (Released: November 14, 2011)
|
 |
|
Notice: Application No. 1608103 - ATCO Electric Ltd. - 2011-2012 General Tariff Application Compliance Filing For Directions Arising from AUC Decision 2011-459 (Released: February 2, 2012) Notice: Application No. 1608111 - ATCO Pipelines - Final Unaccounted for Gas/Fuel Rate Request for Filing Exemption (Released: February 1, 2012) Notice: Application No. 1608112 - ENMAX Power Corporation - Quarterly Transmission Access Charge (TAC) Deferral Account Rider Application – April 1, 2012 (Released: February 1, 2012) Notice: Application No. 1608113 - ATCO Electric Ltd. - 2012 Final Tariff Application (Released: February 1, 2012) Notice: Application No. 1608020 - ATCO Electric Ltd. - Heisler 764S Substation Expansion and 144-kV Transmission Line in the Heisler area (Released: February 1, 2012) Notice: Application Nos. 1607645, 1607672, 1607701 - Alberta Electric System Operator; ATCO Electric Ltd. - Applications for Swan River 735S and Edith Lake 739S Substations Capacity Upgrades in the Swan Hills area (Released: January 31, 2012) Notice: Applications 1607861 and 1607961 - Alberta Electric System Operator; AltaLink Management Ltd. - Application for transmission upgrades in the Lac La Biche area (Released: January 26, 2012) Notice: Application Nos. 1607977; 1608000 - Alberta Electric System Operator; AltaLink Management Ltd. - Transmission upgrades in the Clearwater County area (Released: January 25, 2012) Notice: Application No. 1608056 - Alberta Electric System Operator - Notice of filing of reliability standard PRC-018-AB-1 Disturbance Monitoring Equipment Installation and Data Reporting (Released: January 25, 2012) Notice: Application No. 1608057 - Alberta Electric System Operator - Notice of filing of reliability standard - Definitions related to proposed PRC-018-AB-1 Disturbance and Monitoring Equipment Installation and Data Reporting (Released: January 25, 2012) Notice: Application No. 1608078 - EPCOR Distribution & Transmission Inc. - 2012 Revised Distribution Access Service Interim Rates (Released: January 25, 2012) Notic: Application No. 1607894 - ATCO Electric Ltd. - Transmission line relocations in the Fort McMurray area (Released: January 20, 2012) Notice: Application No. 1607938 - ATCO Electric Ltd. - Drumheller Telecommunication Tower Replacement within the west boundary of Drumheller (Released: January 20, 2012) Notice: Application No. 1607939 - ATCO Electric Ltd. - Fleet Telecommunication Tower in the Coronation area (Released: January 20, 2012) Revised notice of hearing: Application No. 1607570 - AltaLink Management Ltd. - Transmission Line 902L Conductor Replacement Wabamun Lake Area (Released: January 19, 2012)
|
 |
|
Utility Cost Order 2010-035 - AltaGas Utilities Inc. - Issue of Common Shares to AltaGas Utility Holdings Inc. (Released: June 25, 2010) Utility Cost Order 2010-034 - ENMAX Power Corporation - Interim Decision on Decision 2009-035 Formula Based Ratemaking Compliance Application (Released: June 21, 2010) Utility Cost Order 2010-033 - ENMAX Energy Corporation - 2007-2008 Regulated Rate Option Non-Energy NSA - 2009 Adjustments (Released: June 21, 2010) Utility Cost Order 2010-032 - ENMAX Power Corporation - 2008-2016 Distribution Tariff Phase II (Released: May 27, 2010) Utility Cost Order 2010-031 - Alberta Electric System Operator - Compliance with Directions in Decision 2009-105 (Released: May 14, 2010) Utility Cost Order 2010-030 - ATCO Electric Ltd. - 2010 Interim Distribution Tariff and Transmission Facility Owner’s Tariff (Released: May 13, 2010) Utility Cost Order 2010-029 - AltaGas Utilities Inc. - Inter-Affiliate Code of Conduct Exemptions (Released: May 12, 2010) Utility Cost Order 2010-028 - FortisAlberta Inc. - Interim 2010 Distribution Tariff (Released: April 19, 2010) Utility Cost Order 2010-027 - ATCO Pipelines - 2009 Load Balancing Deferral Account (Released: April 15, 2010) Utility Cost Order 2010-026 - ATCO Electric Ltd. - 2010 Distribution Tariff - Phase II (Released: April 14, 2010) Utility Cost Order 2010-024 - ATCO Gas - 2008-2009 General Rate Application Phase I Second Compliance Filing (Released: April 13, 2010) Utility Cost Order 2010-025 - FortisAlberta Inc. - 2008 AESO Charges Deferral Account and 2010 Quarterly Transmission Adjustment Rider Application (Released: April 13, 2010) Utility Cost Order 2010-023 - EPCOR Energy Alberta Inc. - Review Hearing on Alberta Energy and Utilities Board Decision 2008-031, 2007-2009 Regulated Rate Tariff Non-Energy Return (Released: March 26, 2010) Utility Cost Order 2010-021 - City of Red Deer - 2009-2011 Transmission Facility Owner (Released: March 25, 2010) Utility Cost Order 2010-022 - City of Lethbridge - 2009-2011 Transmission Facility Owner General Tariff Application (Released: March 25, 2010)
|
 |
|
Order U2012-36 - AltaGas Holdings Inc. - Appendix 1 to Decision 2012-034 - Gordondale Power Plant (Released: February 2, 2012) Order U2012-37 - AltaGas Holdings Inc. - Appendix 2 to Decision 2012-034 - Connect Gordondale Power Plant to ATCO Electric Ltd.’s Distribution System (Released: February 2, 2012) Order U2011-395 (Errata) - AltaLink Management Ltd. - Appendix 2 to Decision 2011-445 - Alter Transmission Line 953L (Released: January 27, 2012) Order U2011-396 (Errata) - AltaLink Management Ltd. - Appendix 3 to Decision 2011-445 - New Transmission Line 1047L (Released: January 27, 2012) Order U2011-398 (Errata) - AltaLink Management Ltd. - Appendix 5 to Decision 2011-445 - New Transmission Line 679L/680L (Released: January 27, 2012) Order U2011-399 (Errata) - ATCO Electric Ltd. - Appendix 6 to Decision 2011-445 - Transmission Line 9L953 (Released: January 27, 2012) Order U2012-9 - TransAlta Corporation - Appendix 1 to Decision 2012-027 - Alter Keephills Units 1 and 2 Power Plant (Released: January 24, 2012) Permit and Licence No. U2012-26 - AltaLink Management Ltd. - Appendix 1 to DA 2012-12 - Alter Hardisty 377S Substation (Released: January 23, 2012) Order U2012-6 - Cenovus FCCL Ltd. - Appendix 1 to Decision 2012-009 - Alter Foster Creek 1200S Substation (Released: January 23, 2012) Order U2012-7 - Cenovus FCCL Ltd. - Appendix 2 to Decision 2012-009 - Foster Creek Industrial System Designation Amendment (Released: January 23, 2012) Order U2012-8 - ATCO Electric Ltd. - Appendix 3 to Decision 2012-009 - Connect Transmission Line 7L86 to Foster Creek 1200S Substation (Released: January 23, 2012) Order U2012-25 - ENMAX Bonnybrook Inc. - 165-MW Natural Gas Power Plant (Released: January 20, 2012) Order U2012-22 - Genalta Power Inc. - Appendix 1 to Decision 2012-022 - 4-MW Power Plant (Released: January 19, 2012) Order U2012-23 - Genalta Power Inc. - Appendix 2 to Decision 2012-022 - Connect Cadotte Power Plant to ATCO Electric Ltd. Distribution System (Released: January 19, 2012) Order U2012-24 - Alberta Electric System Operator - Appendix 1 to Decision 2012-023 - Athabasca Area Telecommunications Upgrades (Released: January 19, 2012)
|
 |
|
Consent Order M2009-001 - Market Surveillance Administrator; Syncrude Canada Ltd. - Determination with respect to the Late Payment of a Specified Penalty (Released: January 26, 2009) Order M2008-013 - TransCanada - Motion for Filing of ISO Rules 6.6 Recommendation Paper and Evidence Regarding ISO Rule 6.6 (Released: December 17, 2008) M2008-012 - Alberta Electric System Operator - Request by the AESO regarding the Confidentiality of OPP 704 (Released: December 8, 2008) Order M2008-011 - Alberta Electric System Operator - Request by AESO regarding the Confidentiality of OPP 1001, OPP 1002 and OPP 1003 (Released: November 25, 2008) Order M2008-010 - Alberta Electric System Operator - Withdraw of ISO Rule Filing Operating Policy and Procedure 517 (Released: November 4, 2008) M2008-009 - MSA - Order by the Alberta Utilities Commission to Rescind Commission Order M2008-008 (Released: September 25, 2008) M2008-008 - MSA - EPCOR Motion for Information Disclosure Regarding Operation of Sundance Units by TransAlta Utilities Corporation (Released: August 22, 2008) M2008-007 - MSA - Request by the Market Surveillance Administrator (MSA) for Notice to Attend (Released: August 11, 2008) M2008-006 - MSA - Confidentiality Motion by TransCanada Energy Ltd. (TransCanada) (Released: August 5, 2008) M2008-005 - MSA - Withdrawl by EPCOR PPA Management Inc. (EPCOR) of its Confidentiality Motion (Released: July 28, 2008) M2008-003 - Alberta Electric System Operator - Request by the Alberta Electric System Operator (AESO) regarding the Confidentiality of OPP 808 - Sabotage Reporting (Released: July 24, 2008) M2008-004 - Alberta Electric System Operator - Request by the AESO regarding the Confidentiality of OPP 1001 - System Coordination Centre Emergency Evacuation and Backup Coordination Centre Activation (Released: July 24, 2008) M2008-002 - Alberta Electric System Operator - Withdrawl by TransAlta Corporation (TransAlta) of its objection to OPP 515 - South Area Operation (Released: July 18, 2008) M2008-001 - Alberta Electric System Operator - Request by the Alberta Electric System Operator (AESO) regarding the Confidentiality of OPP 704 - Remedial Action Schemes (Released: July 16, 2008)
|
 |
|
Administration Fee Order AF2011-15 - ATCO Gas and Pipelines Ltd. - Payment of administration fee (Released: December 7, 2011) Administration Fee Order AF2011-16 - ATCO Gas and Pipelines Ltd. - Payment of administration fee (Released: December 7, 2011) Administration Fee Order AF2011-17 - AltaGas Utilities Inc. - Payment of administration fee (Released: December 7, 2011) Administration Fee Order AF2011-18 - Direct Energy Marketing Ltd. (Gas Retail) - Payment of administration fee (Released: December 7, 2011) Administration Fee Order AF2011-19 - ATCO Electric Ltd. - Payment of administration fee (Released: December 7, 2011) Administration Fee Order AF2011-20 - FortisAlberta Inc. - Payment of administration fee (Released: December 7, 2011) Administration Fee Order AF2011-21 - EPCOR Distribution & Transmission Inc. - Payment of administration fee (Released: December 7, 2011) Administration Fee Order AF2011-22 - ENMAX Power Corporation - Payment of administration fee (Released: December 7, 2011) Administration Fee Order AF2011-23 - ENMAX Power Corporation - Payment of administration fee (Released: December 7, 2011) Administration Fee Order AF2011-24 - EPCOR Energy Alberta Inc. (FortisAlberta Inc. Service Area) - Payment of administration fee (Released: December 7, 2011) Administration Fee Order AF2011-25 - EPCOR Energy Alberta Inc. (EPCOR Distribution and Transmission Inc. Service Area) - Payment of administration fee (Released: December 7, 2011) Administration Fee Order AF2011-26 - Direct Energy Marketing Ltd. (Electric Retail) - Payment of administration fee (Released: December 7, 2011) Administration Fee Order AF2011-27 - Independent System Operator - Payment of administration fee (Released: December 7, 2011) Administration Fee Order AF2011-28 - Independent System Operator - Payment of administration fee (Released: December 7, 2011) Administration Fee Order AF2011-01 - ATCO Pipelines – Gas Transmission - Payment of administration fee (Released: April 7, 2011)
|
 |
|
News Release 2011-07 - Alberta Utilities Commission approves Heartland Transmission Project (Released: November 1, 2011) Media advisory 2011-01 - Alberta Utilities Commission to release Heartland decision November 1 (Released: October 24, 2011) News Release 2011-06 - Alberta Utilities Commission suspends critical transmission infrastructure applications at government request (Released: October 21, 2011) News Release 2011-05 - Alberta Utilities Commission introduces changes to utility disconnection and reconnection practices to protect vulnerable customers. (Released: October 14, 2011) 2011-04 - AUC's statement regarding the John Davis fatality inquiry (Released: May 24, 2011) News Release 2011-03 - Alberta Utilities Commission launches enhanced public hearing process for expected Eastern Alberta Transmission Line application (Released: February 10, 2011) News Release 2011-02 - Alberta Utilities Commission launches enhanced public hearing process for expected Western Alberta Transmission Line application (Released: January 31, 2011) News Release 2011-01 - Alberta Utilities Commission announces details of community hearing sessions for Heartland Transmission Project application (Released: January 11, 2011) News Release 2010-05 - Alberta Utilities Commission sets April 11, 2011 date for public hearing into Heartland Transmission Project application (Released: November 8, 2010) News Release 2010-04 - Alberta Utilities Commission approves need for electricity transmission reinforcement in Hanna region (Released: April 29, 2010) News Release 2010-03 - AUC improves review of rate-related applications, tightens timelines (Released: April 26, 2010) News Release 2010-02 - Alberta Utilities Commission Releases Heartland Information Session Schedule (Released: March 3, 2010) News Release 2010-01 - AUC Launches Enhanced Participation Opportunities for Heartland Transmission Project (Released: January 20, 2010) News Release 2009-06 - Alberta Utilities Commission Discontinues Return-on-Equity Formula, Sets New Return Level and Equity Ratio For Alberta Utilities (Released: November 12, 2009) News Release 2009-05 - Alberta Utilities Commission Approves Application for Electricity Transmission Reinforcement in Southern Alberta (Released: September 9, 2009)
|
 |
|
|