What is an RSS?
RSS stands for Really Simple Syndication, and it is a technology to provide a "feed" of recently updated items on the website.
To view the RSS Feed, you need to use a RSS Reader and then add the the relevant feeds to the Reader. Many modern browsers come with a RSS Reader.
Windows Internet Explorer NewsGator Firefox Other
If you have a RSS Reader, the following RSS Feeds are available for you:
Decisions
Licenses
Notices
Cost Orders
Utility Orders
Market Orders
Administration Fee Orders
News Releases
An aggregated RSS Feed is also available, which provides all documents from the above list as one single feed.
Recent Updates (Aggregated Feed)
Decision 2010-056 - ATCO Electric Ltd. - 2009-2010 General Tariff Application – Phase I Compliance Filing (Released: February 9, 2010) Decision 2010-055 - EPCOR Energy Alberta Inc. - Review Hearing on Alberta Energy and Utilities Board Decision 2008-031, 2007-2009 Regulated Rate Tariff Non-Energy Return (Released: February 8, 2010) Decision 2010-063 - AltaLink Management Ltd. - Alterations to Southeast Alberta 240-kV Transmission Line 924L (Released: February 5, 2010) Decision 2010-059 - TransCanada Energy Ltd. - Construct and Operate Saddlebrook Power Station (Released: February 3, 2010) Decision 2010-062 - ATCO Electric Ltd. - Exemption of Emergency Back-up Generators for Drumheller, Wintering Hills, and Chain Lakes Telecommunication Towers (Released: February 3, 2010) Decision 2010-058 - 2010-058 - Time Extension and Gathering System Voltage Change for the Construction of Castle Rock Ridge Wind Power Plant (Released: January 29, 2010) Decision 2010-054 - AltaLink Management Ltd. - 2010 Interim Tariff Application (Released: January 27, 2010) Decision 2010-037 - EnCana FCCL Ltd. - Amendment to Industrial System Designation Order U2009-313 (Released: January 26, 2010) Decision 2010-051 - Town of Mayerthorpe - Waste Management Agreement with Northwest Sanitation Ltd. (Released: January 25, 2010) Decision 2010-052 - Village of Hill Spring - Franchise Agreement with ATCO Gas and Pipelines Ltd. (Released: January 25, 2010) Decision 2010-053 - ATCO Gas South - Amendment to Riders “A” and “B” with respect to the Village of Hill Spring (Released: January 25, 2010) Decision 2010-050 - ATCO Gas - South Load Balancing Deferral Account Application for an Exemption to File an Application for a Rate Rider (Released: January 25, 2010) Decision 2010-009 - AltaLink Management Ltd. - Time Extension for Decommissioning and Removal of Bonnie Glen 449S Substation and 838/837L (Released: January 22, 2010) Decision 2010-038 - ATCO Pipelines - 2010 Interim Revenue Requirement and 2010 Interim Rates (Released: January 22, 2010) Decision 2010-042 - AltaLink Management Ltd. - Adding Emergency Generators to Reinforce the Existing Battery Backup Systems at Foothills Radio Site and Sarcee 42S Substation (Released: January 22, 2010)
|
 |
|
Permit / Licence No. 30475 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to Decision 2010-049 Pipeline Split, Removal and New Construction (Released: January 22, 2010) Permit / Licence No. 52 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to Decision 2010-033 - Gas Utility Pipeline Record Correction (Released: January 14, 2010) Permit / Licence No. 9770 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to Decision 2010-034 - Gas Utility Pipeline Record Correction (Released: January 14, 2010) Permit / Licence No. 11669 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to Decision 2010-032 Gas Utility Pipeline Split, Removal and New Construction (Released: January 13, 2010) Permit / Licence No. 30475 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to Decision 2010-018 - Gas Utility Pipeline Split, Removal and New Construction (Released: January 7, 2010) Permit / Licence No. 19223 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to Decision 2010-001 Gas Utility Pipeline Record Correction (Released: January 4, 2010) Permit / Licence No. 6084 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to Decision 2009-277 - Gas Utility Pipeline Abandonment (Released: December 22, 2009) Permit / Licence No. 7029 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to Decision 2009-278 - Gas Utility Pipeline Abandonment (Released: December 22, 2009) Permit / Licence No. 7778 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to Decision 2009-269 - Gas Utility Pipeline Pipeline Split, Abandonment, Record Corrections and Mapping Correction (Released: December 17, 2009) Permit / Licence No. 7828 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to Decision 2009-257 - Gas Utility Pipeline Record Corrections and Mapping Correction (Released: December 14, 2009) Permit / Licence No. 2743 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to Decision 2009-256 - Gas Utility Pipeline Pipeline Split, Removal and Record Correction (Released: December 14, 2009) Permit / Licence No. 2742 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to Decision 2009-254 - Gas Utility Pipeline Split, Removal and Record Correction (Released: December 11, 2009) Permit / Licence No. 9530 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to Decision 2009-250; Gas Utility Pipeline New Construction (Released: December 9, 2009) Permit / Licence No. 2594 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to Decision 2009-249; Pipeline Split, Gas Utility Pipeline Removal and New Construction (Released: December 9, 2009) Permit / Licence No. 5448 - ATCO Gas and Pipelines Ltd. (South) - Appendix 1 to Decision 2009-247; Gas Utility Pipeline Record Corrections and Mapping Correction (Released: December 8, 2009)
|
 |
|
Notice: Application No. 1605883 - ATCO Gas - Approval to Implement Rider “T” Effective April 1, 2010 (Released: February 9, 2010) Amended Notice of Applications & Hearing: Application Nos. 1602573, 1602574, 1605728, 1605746 - Fortuna GP, Inc.; Alberta Electric System Operator; ATCO Electric Ltd. - Ghost Pine Wind Power Plant and Substation (Released: February 9, 2010) Notice: Application Nos. 1604982 & 1604983 - Suncor Energy Products Inc. - Wintering Hills Wind Power Project Wheatland County (Released: February 5, 2010) Notice: Application No. 1605873 - ATCO Gas - Approval to Implement Recovery Riders “G” and “I” Effective April 1, 2010 (Released: February 5, 2010) Notice: Application No. 1605793 - ENMAX Power Corporation - No. 16 Substation (Released: February 5, 2010) Notice of Hearing Cancellation: Application Nos. 1605266 & 1605438 - Alberta Electric System Operator; ATCO Electric Ltd. - North-Central Transmission System Development High Prairie, Swan Hills and Slave Lake Regions (Released: February 5, 2010) Notice: Application No. 1605734 - Penn West Petroleum Ltd. - Installing Gas-Fuelled Electric Generator to Power Compressor Facility Power Plant Exemption - Brooks Area (Released: February 5, 2010) Notice: Application No. 1605866 - AltaLink Management Ltd. - Refiling Pursuant to AUC Decision 2009-248 (Refiling Application) (Released: February 4, 2010) Notice: Application Nos. 1605538 & 1605606 - Alberta Electric System Operator; AltaLink Management Ltd. - Cold Creek Substations Capacity Increase (Released: February 3, 2010) Notice: Application No. 1605864 - FortisAlberta Inc. - Micro-generation Determination (Released: February 2, 2010) Notice: Application No. 1605725 - Breaker Energy Ltd. - Gas-Driven Generator to Power Oil Battery Site Power Plant Exemption Valleyview Area (Released: February 2, 2010) Notice: Application Nos. 1605456 & 1605489 - Alberta Electric System Operator; ATCO Electric Ltd. - Line Relocation Transmission Project (Released: February 2, 2010) Notice: Application No. 1605809 - Collaborative Benchmarking Team - Collaborative Benchmark Study of Customer Care & Billing Services to Direct Energy Regulated Services (Released: February 1, 2010) Notce: Application No. 1605840 - Direct Energy Regulated Services - 2009/2010/2011 Default Rate Tariffs and Regulated Rate Tariffs Compliance Filing (Released: January 29, 2010) Notice: Application No. 1605241 - TransCanada Turbines Limited - 40 MW Power Plant and Substation (Released: January 28, 2010)
|
 |
|
Utility Cost Order 2010-012 - EPCOR Distribution & Transmission Inc. - True-up of the Transmission Charge Deferral Account for the Period Ending December 31, 2008 (Released: February 9, 2010) Utility Cost Order 2010-010 - ATCO Gas - 2009-2010 Unaccounted for Gas Rates – Rider “D” (Released: January 28, 2010) Utility Cost Order 2010-011 - ATCO Pipelines (A Division of ATCO Gas and Pipelines Ltd.) - 2009-2010 Unaccounted for Gas and Fuel Rates – Rider “D” (Released: January 28, 2010) Utility Cost Order 2010-007 - ATCO Gas - 2008-2009 General Rate Application Phase I (Released: January 26, 2010) Utility Cost Order 2010-008 - Fortuna GP, Inc. - Advance Funding (Released: January 26, 2010) Utility Cost Order 2010-006 - Regional Water Services Ltd. (RWSL) - 2007-2008 General Rate Application – Advance Funding (Released: January 25, 2010) Utility Cost Order 2010-005 - ATCO Electric Ltd. - 2009-2010 General Tariff Application – Regulatory Treatment of Income Tax Refund (Released: January 21, 2010) Utility Cost Order 2010-004 - Direct Energy Regulated Services - 2009-2010/2011 Default Rate Tariffs and Regulated Rate Tariffs (Released: January 20, 2010) Utility Cost Order 2010-002 - ENMAX Power Corporation - 2007-2016 Formula Based Ratemaking: Line Loss Proposal (Released: January 7, 2010) Utility Cost Order 2010-003 - ENMAX Sheppard Inc. - Advance Funding (Released: January 7, 2010) Utility Cost Order 2010-001 - AltaGas Utilities Inc. - 2008-2009 General Rate Application Phase I (Released: January 5, 2010) Utility Cost Order 2009-059 - Direct Energy Regulated Services - 2008 Default Rate Tariff and Regulated Rate Tariff Non-Energy Deferral Accounts (Released: January 4, 2010) Utility Cost Order 2009-058 - Westridge Utilities Inc. - 2005-2006 Interim Rate Application, 2007-2008 Interim Rate Application Board Staff Recommendation General Rate Application and Compliance Filing (Released: December 24, 2009) Utility Cost Order 2009-056 - ATCO Electric Ltd. - Simonette Remediation Application (Released: December 17, 2009) Utility Cost Order 2009-057 - ATCO Electric Ltd. - Application Seeking Confirmation of Scope of Negotiated Settlement Approved in Decision 2002-102 (Released: December 17, 2009)
|
 |
|
Order U2010-42 - ATCO Electric Ltd. - Power Plant Exemption - 20-kW Back-up Emergency Power Plant Drumheller Telecommunications Tower (Released: February 3, 2010) Order U2010-43 - ATCO Electric Ltd. - Power Plant Exemption - 20-kW Back-up Emergency Power Plant Wintering Hills Telecommunications Tower (Released: February 3, 2010) Order U2010-44 - ATCO Electric Ltd. - Power Plant Exemption - 20-kW Back-up Emergency Power Plant Chain Lakes Telecommunications Tower (Released: February 3, 2010) Order U2010-74 - TransCanada Energy Ltd. - Power Plant Approval - 338 MW Saddlebrook Power Station (Released: February 3, 2010) Order U2010-72 - Enel Alberta Wind Inc. - Appendix 1 to Decision 2010-72 - Power Plant Approval for Alteration of Castle Rock Ridge Wind Farm (Released: January 29, 2010) Order U2010-47 - EnCana FCCL Ltd. - Appendix 1 to Decision 2010-037 - Industrial System Designation for Foster Creek Thermal Oil Sands (Released: January 26, 2010) Exemption No. U2010-053 - AltaLink Management Ltd. - Appendix to Decision 2010-042 System Control Center Communication (SCC) Upgrade existing battery backup systems (Released: January 22, 2010) Order U2010-41 - AltaLink Management Ltd. - Appendix to Decision 2010-026 - Transmission Line Permit and Licence to Construct 138-kV transmission line 678L (Released: January 22, 2010) Approval No. U2010-8 - AltaLink Management Ltd. - Appendix 1 to Decision 2010-009 Time Extension Bonnie Glen 449S Substation (Released: January 22, 2010) Order U2010-9 - The City of Lethbridge - Appendix to Decision 2010-014 - Transmission Line Permit and Licence to Rebuild 138-kV Transmission Line 734L (Released: January 22, 2010) Order U2010-10 - The City of Lethbridge - Appendix to Decision 2010-014 - Transmission Line Permit and Licence for new 138-kV Transmission Line 667L Lethbridge, Alberta (Released: January 22, 2010) Order U2010-11 - The City of Lethbridge - Appendix to Decision 2010-014 - Substation Permit and Licence for MacDonald 146S Substation Lethbridge, Alberta (Released: January 22, 2010) Order U2010-12 - The City of Lethbridge - Appendix to Decision 2010-014 - Transmission Line Permit and Licence to Rebuild 138-kV Transmission Line 813L (Released: January 22, 2010) Exemption No. U2010-28 - Venturion Natural Resources Operations Limited - Appendix to Decision 2010-017 Exemption for a 75-kW Power Plant in the Worsley Area (Released: January 22, 2010) Approval No. U2010-13 - Alberta Electric System Operator - Appendix 1 to Decision 2010-015 Need Identification Document (Released: January 21, 2010)
|
 |
|
Consent Order M2009-001 - Market Surveillance Administrator; Syncrude Canada Ltd. - Determination with respect to the Late Payment of a Specified Penalty (Released: January 26, 2009) Order M2008-013 - TransCanada - Motion for Filing of ISO Rules 6.6 Recommendation Paper and Evidence Regarding ISO Rule 6.6 (Released: December 17, 2008) M2008-012 - Alberta Electric System Operator - Request by the AESO regarding the Confidentiality of OPP 704 (Released: December 8, 2008) Order M2008-011 - Alberta Electric System Operator - Request by AESO regarding the Confidentiality of OPP 1001, OPP 1002 and OPP 1003 (Released: November 25, 2008) Order M2008-010 - Alberta Electric System Operator - Withdraw of ISO Rule Filing Operating Policy and Procedure 517 (Released: November 4, 2008) M2008-009 - MSA - Order by the Alberta Utilities Commission to Rescind Commission Order M2008-008 (Released: September 25, 2008) M2008-008 - MSA - EPCOR Motion for Information Disclosure Regarding Operation of Sundance Units by TransAlta Utilities Corporation (Released: August 22, 2008) M2008-007 - MSA - Request by the Market Surveillance Administrator (MSA) for Notice to Attend (Released: August 11, 2008) M2008-006 - MSA - Confidentiality Motion by TransCanada Energy Ltd. (TransCanada) (Released: August 5, 2008) M2008-005 - MSA - Withdrawl by EPCOR PPA Management Inc. (EPCOR) of its Confidentiality Motion (Released: July 28, 2008) M2008-003 - Alberta Electric System Operator - Request by the Alberta Electric System Operator (AESO) regarding the Confidentiality of OPP 808 - Sabotage Reporting (Released: July 24, 2008) M2008-004 - Alberta Electric System Operator - Request by the AESO regarding the Confidentiality of OPP 1001 - System Coordination Centre Emergency Evacuation and Backup Coordination Centre Activation (Released: July 24, 2008) M2008-002 - Alberta Electric System Operator - Withdrawl by TransAlta Corporation (TransAlta) of its objection to OPP 515 - South Area Operation (Released: July 18, 2008) M2008-001 - Alberta Electric System Operator - Request by the Alberta Electric System Operator (AESO) regarding the Confidentiality of OPP 704 - Remedial Action Schemes (Released: July 16, 2008)
|
 |
|
Administration Fee Order 2009-15 - ATCO Gas and Pipelines Ltd. - (Released: November 30, 2009) Administration Fee Order 2009-16 - ATCO Gas and Pipelines Ltd. (ATCO Gas – Gas Distribution) - (Released: November 30, 2009) Administration Fee Order 2009-17 - AltaGas Utilities Inc. - (Released: November 30, 2009) Administration Fee Order 2009-18 - Direct Energy Marketing Limited (Gas Retail) - (Released: November 30, 2009) Administration Fee Order 2009-19 - ATCO Electric Ltd. - (Released: November 30, 2009) Administration Fee Order 2009-20 - FortisAlberta Inc. - (Released: November 30, 2009) Administration Fee Order 2009-21 - EPCOR Distribution and Transmission Inc. - (Released: November 30, 2009) Administration Fee Order 2009-22 - ENMAX Power Corporation - (Released: November 30, 2009) Administration Fee Order 2009-23 - ENMAX Energy Corporation - (Released: November 30, 2009) Administration Fee Order 2009-24 - EPCOR Energy Alberta Inc. - (Released: November 30, 2009) Administration Fee Order 2009-25 - EPCOR Energy Alberta Inc. - (Released: November 30, 2009) Administration Fee Order 2009-26 - Direct Energy Marketing Limited (Electric Retail) - (Released: November 30, 2009) Administration Fee Order 2009-27 - Independent System Operator, also known as Alberta Electric System Operator (Tariff) - (Released: November 30, 2009) Administration Fee Order 2009-28 - Independent System Operator, also known as Alberta Electric System Operator (Market Participant Services) - (Released: November 30, 2009) Administration Fee Order 2009-01 - ATCO Gas and Pipelines Ltd. (ATCO Pipelines - Transmission) - Administration Fee Category 1 (Released: May 1, 2009)
|
 |
|
News Release 2010-01 - AUC Launches Enhanced Participation Opportunities for Heartland Transmission Project (Released: January 20, 2010) News Release 2009-06 - Alberta Utilities Commission Discontinues Return-on-Equity Formula, Sets New Return Level and Equity Ratio For Alberta Utilities (Released: November 12, 2009) News Release 2009-05 - Alberta Utilities Commission Approves Application for Electricity Transmission Reinforcement in Southern Alberta (Released: September 9, 2009) News Release 2009-04 - AUC Approves ATCO Gas 2009 Interim Rates (Released: April 27, 2009) News Release 2009-03 - AUC Approves New Formula-Based Ratemaking for ENMAX Power Corp. (Released: March 25, 2009) News Release 2009-02 - AUC Approves AltaLink Pincher Creek to Lethbridge 240-kV Transmission Project (Released: March 10, 2009) News Release 2009-01 - Alberta Utilities Commission Schedules Hearing, Seeks Comment on Need Application for Electricity Transmission Reinforcement in Southern Alberta (Released: March 9, 2009) EUB NR 2009-05 - EUB Issues Natural Gas Liquids Inquiry Decision (Released: February 4, 2009) NRCB AUC CEAA NR02 - Joint panel decision issued on Glacier Power Ltd. Peace River hydroelectric project (Released: December 22, 2008) AUC NR 2008-04 - Alberta Utilities Commission (AUC) Approves Interim Rates and Four-Month Billing Defficiency Rider for AltaGas Utilities Inc. (Released: October 21, 2008) AUC NR 2008-03 - Temporary Rate Increase for EPCOR Customers (Released: September 16, 2008) NR 2006-35 - EUB Approves Temporary Rate Increase For EPCOR RRT Customers In The Fortis Service Area (Released: August 28, 2008) EUB NR 2008 05 - EUB Finalizes Approval of Merchant Power Line Application (Released: August 13, 2008) 005 - Joint Panel Established for the Proposed Dunvegan Hydroelectric Project (Released: July 16, 2008) AUC NR 2008-02 - Alberta Utilities Commission Approval of ATCO Electric Ltd. Rate Rider Will Result in Refunds to Most Customer Classes for the Remainder of 2008 (Released: July 16, 2008)
|
 |
|
|