Hanna Region Transmission Development 
 
Application Number(s) 1606753
Proceeding ID No. 938
Applicant(s) AltaLink management Ltd.
Area Hanna Region and Hardisty Area
Description

The project proposes to:

  • Construct and operate a new substation, southeast of Hardisty, designated as Nilrem 574S, proposed to be located in the northeast quarter of Section 9, Township 42, Range 9, west of the Fourth Meridian. The substation would consist of two 240/320/400-mega volt amperes (MVA) 240/138-kilovolt (kV) transformers, three 240-kV circuit breakers, three 138-kV circuit breakers, and associated substation equipment within a chain link fence enclosure.
  • Construct and operate approximately 25 kilometres (km) of new 240-kV double-circuit transmission line, designated as 953L/1047L, from a connection point on existing 240-kV transmission line 953L to the proposed Nilrem 574S, as shown in the attached map.
  • Alter the portion of the existing transmission line 953L, from the proposed 953L/1047L connection point to existing substation Hansman Lake 650S, by renaming that portion of transmission line as 1047L.
  • Alter existing Tucuman 478S substation by adding two new 138-kV circuit breakers.
  • Construct and operate approximately 6.5 km of new 138-kV double-circuit transmission line, designated as 679L/680L, from existing Tucuman 478S substation to the proposed Nilrem 574S substation, as shown in the attached map.
AUC Contact

Victor Choy
403-592-4439
victor.choy@auc.ab.ca 

More Information

Click here to view further details of the application

Become a registered participant Complete the Submission form for transmission line and substation applications and file it with the AUC
Listening in AUC hearings