Heartland Transmission Project 
 
Application number 1606609
EPS Proceeding ID No. 457
Applicant(s)

EPCOR Distribution & Transmission Inc.  & AltaLink L.P.

Area Central
Description The project consists of three main components, namely:

• Construct 240/500-kilovolt (kV) Heartland 12S substation to be located in the northeast quarter of Section 20, Township 56, Range 22, west of the Fourth Meridian;

• Construct 500- kV double-circuit transmission line 1206L/1212L connecting the 500-kV system on the south side of Edmonton to the proposed Heartland 12S substation; and

• Construct 240-kV double-circuit transmission line 1054L/1061L connecting the 240-kV system in the area to proposed Heartland 12S substation.

The application identifies the proposed Heartland 12S substation, a preferred route and an alternate route for a proposed 500-kV double-circuit transmission line 1206L/1212 along with several local alternate route sections for both the preferred and alternate routes. The application further identifies a preferred route and two alternate routes for proposed 240-kV double-circuit transmission line 1054L/1061L.

The preferred 500-kV route would be a joint project by the applicants whereas the alternate 500-kV route would be strictly an AltaLink project. Transmission line 1054L/1061L and Heartland 12S substation would be AltaLink projects.

AUC contact

Keith Gladwyn
403-592-4414
keith.gladwyn@auc.ab.ca

More information

Click here to view further details of the application in our Proceeding Search System.

More information on the enhanced process and how interested parties can get involved is also available in the Items of Interest section, on the Heartland Transmission Project page.

Become a registered participant Complete the Submission form and file it with the AUC
Listening in AUC hearings