Current applications

Current applications

This report is automatically generated from the eFiling System

Current applications

The current applications tool below lists all applications that are currently active with the AUC. You are able to enter search criteria to find a specific active application. This tool will only give general information about the application. For more detailed information or to access the full proceeding please log-in to the AUC's eFiling System.

  
  
  
  
  
23661-A001Facility Application for Kirby North Central Processing Facility Connection2018-06-15Canadian Natural Resources Limited23661
23658-A0012018-2021 EPSP Refiling Cost Claim2018-06-14Epcor Energy Alberta Gp Inc.23658
23657-A001Life Cycle Replacement of 72RS5 and Strathcona Capacity Increase2018-06-14Epcor Distribution & Transmission Inc.23657
23656-A001EEC 2018 July 1 Default Supplier Tariffs2018-06-14ENMAX Energy Corporation23656
23655-A001ENMAX No. 9 Substation LOE - Arc Flash Mitigation and Reliability Upgrade2018-06-14ENMAX Power Corporation23655
23653-A001Kirby North Central Processing Facility Connection Needs Identification Document2018-06-15Independent System Operator23653
23650-A001ATCO Electric's letter requesting to file a Phase II Application2018-06-13ATCO Electric Ltd.23650
23649-A001FortisAlberta 2017 Capital Tracker True-Up Application2018-06-15FortisAlberta Inc.23649
23648-A002ATCO Gas and Pipelines Ltd. (South) Licence 47944 - Line Split - Removal2018-06-12ATCO Gas and Pipelines Ltd. (SOUTH)23648
23648-A001ATCO Gas and Pipelines Ltd. (South) Licence 1534 - Line Split - Removals2018-06-12ATCO Gas and Pipelines Ltd. (SOUTH)23648
23234-A002Skaro 109S ownership change and time extension request2018-05-30Deerland Power Inc.23234
23628-A004EDTI 2018 GCOC Cost Claim2018-06-07Epcor Distribution & Transmission Inc.23628
23628-A00322570 - Generic Cost of Capital - CCA Cost Claim2018-06-07Consumers Coalition Of Alberta23628
23628-A002ATCO Electric Transmission and ATCO Pipelines 2018 Generic Cost of Capital - Cost Claim2018-06-07ATCO Electric Ltd.23628
23645-A002Acestes Ventures Ltd. Vulcan Solar Power Plant Interconnection2018-06-11Acestes Ventures Ltd.23645
23645-A001Acestes Ventures Ltd. 25MW Vulcan Solar Project2018-06-11Acestes Ventures Ltd.23645
23580-A002Interconnection of Empress Solar 1 power plant to FortisAlberta Inc. 25 kV distribution feeders2018-06-11Aura Power Renewables Ltd.23580
23643-A001ATCO Gas 2018 Weather Deferral Account Rider W South2018-06-11ATCO Gas South23643
23609-A002ENMAX Power Corporation Letter of Enquiry 138-1.80L and 138-1.81L Underground Transmission Cable Realignment2018-06-11ENMAX Power Corporation23609
23641-A001Strathcona Substation Connection Enhancement Needs Identification Document2018-06-11Independent System Operator23641
22546-A006AML Stirling Wind Project Connection2017-12-13AltaLink Management Ltd.22546
22546-A005AML Stirling Wind Project Connection2017-12-13AltaLink Management Ltd.22546
22546-A004Stirling Wind Project Connection NID2017-12-12Independent System Operator22546
23638-A001Gerard and Donna Fetaz Application to Review and Vary Decision 22563-D01-20182018-06-08Ackroyd LLP23638
23637-A001ENMAX Energy Corporation Amendments to Regulated Rate Option Tariff Terms and Conditions  2018-06-11ENMAX Energy Corporation23637
23544-A002Acestes Ventures Ltd. Jenner Gas Power Plant Interconnection2018-06-07Acestes Ventures Ltd.23544
23633-A002AML Whitecourt 268S Substation Upgrade LOE2018-06-07AltaLink Management Ltd.23633
23633-A001AML Whitecourt 268S Substation Upgrade LOE2018-06-07AltaLink Management Ltd.23633
23632-A001AML Keephills 320P Substation Transformer Replacement LOE 2018-06-07AltaLink Management Ltd.23632
23628-A001 2018 Generic Cost of Capital Cost Claim2018-06-07AltaLink Management Ltd.23628
1 - 30Next