Consultation for Rule 007 - Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

Consultations

Alberta Utilities Commission holds consultations with stakeholders to develop rules

​​Consultation for Rule 007 - Applications for Power Plants, Substations, Transmission Lines and ISDs

Status: Active

Last updated: August 7, 2020

Contact: wayne.mackenzie@auc.ab.ca, sophie.jiang@auc.ab.ca or laura.fukuda@auc.ab.ca​


 August 7, 2020

The AUC seeking feedback on a revised draft version of AUC Rule 007​. The information requirements in the draft rule have bracketed references to the corresponding information requirements in the existing rule. A table of concordance that cross-references major sections and specific information requirements between the draft and current versions is also provided. Further details about the revised draft version of AUC Rule 007 and interim changes to the AUC's participation involvement program can be found in Bulletin 2020-30.​


July 30, 2019

The AUC, in conjunction with Alberta Environment and Parks and the Alberta Electric System Operator, will be holding a workshop in Calgary on September 17, 2019, to provide information about the regulatory process and application requirements for new power plants. Further details about the workshop are included in Bulletin 2019-13.

 

Documents

  
  
  
  
  
  
2020-11-12-Rule007-Agenda-StakeholderMeetingAgenda for Rule 007 stakeholder meeting on November 12, 2020Alberta Utilities Commission2020/11/09other2020
2020-08-07-Rule007-DraftRevisedVersionRule 007 draft revised versionAlberta Utilities Commission2020/08/07Rule (draft)2020
Table of ConcordanceRule 007 table of concordanceAlberta Utilities Commission2020/08/07other2020
2020-08-07-Rule007-DraftRevisedVersionRule 007 draft revised versionAlberta Utilities Commission2020/08/07Rule (draft)2020
Bulletin 2020-30Revised draft version of AUC Rule 007 and interim changes to AUC participation involvement programAlberta Utilities Commission2020/08/07Bulletin2020
2019-11-21-Rule007-StakeholderComments-GreenCatRenewablesShadow flicker review commentsGreen Cat Renewables2019/11/21Comments (stakeholder)2019
2019-11-21-Rule007-StakeholderComments-ZehndorferSolar Glare and Glint Project reviewZehndorfer Engineering2019/11/21Comments (stakeholder)2019
2019-11-14-Rule007-StakeholderComments-CanWEAShadow flicker review commentsCanWEA2019/11/14Comments (stakeholder)2019
Bulletin 2019-13Power plant application workshopAlberta Utilities Commission2019/07/30Bulletin2019
Bulletin 2019-09Interim information requirements for solar and wind energy power plant applicationsAlberta Utilities Commission2019/07/03Bulletin2019
Bulletin 2019-10AUC Rule 007 - Initiation of a review and stakeholder consultation processAlberta Utilities Commission2019/07/03Bulletin2019
2019-04-16-Rule007-ChangesMatrix of Rule 007 changes made in rule effective Aug. 1, 2019Alberta Utilities Commission2019/04/26other2019
2019-04-16-Rule007-BlacklineRule 007 effective August 1, 2019 - blacklined versionAlberta Utilities Commission2019/04/26Rule (blacklined)2019
2019-08-01-Rule007Rule 007 effective August 1, 2019Alberta Utilities Commission2019/04/26Rule (current)2019
Bulletin 2018-12Electric facility applications with major deficiencies will no longer be processedAlberta Utilities Commission2018/08/01Bulletin2018
2018-04-02-Rule007Rule 007 effective April 2, 2018 to July 31, 2019Alberta Utilities Commission2018/03/22Rule (issued)2018
2018-04-02-Rule007-BlacklinedRule 007 effective April 2, 2018 - blacklined versionAlberta Utilities Commission2018/03/22Rule (blacklined)2018
Bulletin 2018-05Amended Rule 007: Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro DevelopmentsAlberta Utilities Commission2018/03/22Bulletin2018
2017-06-21-Rule007-BlacklineJune 2017 draft version of Rule 007Alberta Utilities Commission2017/06/21Rule (blacklined)2017
2017-07-04-Rule007Rule 007 effective July 4, 2017 to April 1, 2018Alberta Utilities Commission2017/06/21Rule (issued)2017
2016-02-01-Rule007Rule 007 effective February 1, 2016 to July 3, 2017Alberta Utilities Commission2016/02/01Rule (issued)2016
2016-01-29-Rule007BlacklineDraftJanuary 2016 draft version of Rule 007Alberta Utilities Commission2016/01/29Rule (blacklined)2016
2016-01-29-Rule007StakeholderCommentsStakeholder comments and AUC responses regarding changes to Rule 007Alberta Utilities Commission2016/01/29Comments (responses)2016
Bulletin 2016-02Amendments to AUC Rule 007 respecting environmental updates and needs identification documentsAlberta Utilities Commission2016/01/29Bulletin2016
2015-10-19-Rule007-Blackline-draftOctober 2015 draft version of Rule 007Alberta Utilities Commission2015/10/19Rule (blacklined)2015
Bulletin 2015-14Draft amendments to AUC Rule 007 respecting environmental requirements and needs identification documentsAlberta Utilities Commission2015/10/19Bulletin2015
2015-09-14-Rule007-meetingEnvironmental stakeholder consultation meeting minutesAlberta Utilities Commission2015/09/14Meeting summary or notes2015
2015-09-01-Rule007FlowChartEnvironmental guidelines for new substation construction or existing substation modification flow chartAlberta Utilities Commission2015/09/01other2015
2015-08-27-Rule007StakeholderCommentMatrixEnvironmentalChecklistStakeholder comments and AUC responses for environmental guidelines checklistAlberta Utilities Commission2015/08/27Comments (responses)2015
2015-08-27-Rule007StakeholderCommentMatrixRolesofAgenciesStakeholder comments and AUC responses regarding the roles of agenciesAlberta Utilities Commission2015/08/27Comments (responses)2015
1 - 30Next

Access all regulatory documents

Anyone can access applications and proceeding information through the eFiling System.

Create a new account or log in below