The AUC will be considering the power plant development applications in Proceeding 30032.

Gransolar Alberta One, Inc. has applied to construct and operate the Blue Heron Solar Project. The project would consist of a 200-megawatt (MW) solar power plant with approximately 415,000 solar photovoltaic modules installed on a single-axis tracking system, a 200-MW/400-megawatt-hour battery energy storage system, and a project substation. The project would also include inverters, an electrical collection system and internal access roads. The project would be located on approximately 430.8 hectares of private cultivated land in Flagstaff County, approximately 11.5 kilometres east of the village of Alliance, as shown in the map below. The applications have been filed under the Hydro and Electric Energy Act.

Hearing Information

To learn more about the review process, or for more information about how you may become involved in this proceeding, please contact us or visit the following webpages:

Summarized process schedule

The Commission has established the following updated process schedule to consider the applications:

Process step Date
Applicant’s deadline to respond to information requests September 16, 2025
Interveners’ written evidence deadline October 1, 2025
Commission letter regarding hearing scope (if necessary) October 14, 2025
Information requests to interveners about intervener evidence October 16, 2025
Interveners’ deadline to respond to information requests October 30, 2025
Applicant’s reply evidence deadline November 10, 2025
Commencement of hearing November 24, 2025, at 10 a.m.

The eFiling System​

The eFiling System should be accessed to view the applications and the other documents the AUC will be considering in this proceeding. The system is also used to file submissions and evidence to participate in the proceeding.

To create an account, select “New account” and follow the steps to create a user ID and password. If you have any questions about how to use the eFiling System please contact us at info@auc.ab.ca or 310-4AUC.

Documents being considered in this proceeding can be found in the eFiling​ System (which requires log in). Once you have logged in, enter 30032 in the “go to” section at the top left corner of your screen.

Blue Heron Solar Project – Power Plant, Substation & Battery Energy Storage System Application
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.