Proceeding in process: AltaLink Request for Approval of 2023 Spring Wildfire and Snow Events Expenditures (Proceeding 28750)

Proceeding 28321  Register

Applications 28321-A001 and 28321-A002

Decision expected: Spring 2024

Watch an AUC hearing

Overview

The Alberta Utilities Commission (AUC), the independent utilities regulator, has cancelled the hearing to review the applications and submissions received to consider the electric transmission development applications in Proceeding 28321. More information can be found in the notice of hearing cancellation.

AltaLink Management Ltd. has applied to decommission and salvage Transmission Line 124L between the Wabamun 2739S Substation and the Wabamun 19S Substation as well as to decommission and salvage the Wabamun 2739S Substation. The map identifies the location of the substation and transmission line. The applications have been filed under the Hydro and Electric Energy Act.

Further information about the proceeding is available through the AUC’s eFiling System under Proceeding 28321.

The eFiling System​

The eFiling System should be accessed to view the applications and the other documents the AUC will be considering in this proceeding. The system is also used to file submissions and evidence to participate in the proceeding.

To create an account, select “New account” and follow the steps to create a user ID and password. If you have any questions about how to use the system please contact us at info@auc.ab.ca or 310-4AUC.

Documents being considered in this proceeding can be found in the eFiling​ System (which requires log in). Once you have logged in, enter 28321 in the “go to” section at the top left corner of your screen.​

Wabamun 2739S Substation and Transmission Line 124L Decommission and Salvage Project