The AUC has approved the transmission line application in Proceeding 29538.

The City of Medicine Hat applied to rebuild approximately 20 kilometres of existing 69-kilovolt (kV) transmission lines 30L and 40L between the NE Crescent Heights MHS-5 Substation and the Southridge MHS-3 Substation. The City proposed to rebuild the lines at a 138-kV standard but to initially operate the lines at 69 kV. The application was filed under the Hydro and Electric Energy Act.

Map images showing proposed location of the project in the Medicine Hat area.

The eFiling System​

The eFiling System should be accessed to view the applications and the other documents the AUC will be considering in this proceeding. The system is also used to file submissions and evidence to participate in the proceeding.

To create an account, select “New account” and follow the steps to create a user ID and password. If you have any questions about how to use the eFiling System please contact us at info@auc.ab.ca or 310-4AUC.

Documents being considered in this proceeding can be found in the eFiling​ System (which requires log in). Once you have logged in, enter 29538 in the “go to” section at the top left corner of your screen.

East Ring Enhancement Project – Transmission Lines 30L and 40L Rebuild
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.