Proceeding 27906  Register

Applications 27906-A001 and 27906-A002

Decision expected: Winter 2024

Watch an AUC hearing

Overview

The Alberta Utilities Commission (AUC) has cancelled the virtual oral hearing for Proceeding 27906, which was scheduled to commence on February 12, 2024, via web conference. The hearing was to consider the applications filed by Kiwetinohk Energy Corp. requesting approval to construct and operate a 350-megawatt solar power plant, designated as the Granum Solar Energy Project, and the associated Champion 1110S Substation. The AUC issued a notice of amendment on February 5, 2024.

Further information about the proceeding is available through the AUC’s eFiling System under Proceeding 27906.


Summarized process schedule

The AUC has established a new process schedule to allow limited final written submissions from the Municipal District of Willow Creek No. 26 and Kiwetinohk Energy Corp.

The eFiling System​

The eFiling System should be accessed to view the applications and the other documents the AUC will be considering in this proceeding. The system is also used to file submissions and evidence to participate in the proceeding.

To create an account, select “New account” and follow the steps to create a user ID and password. If you have any questions about how to use the system please contact us at info@auc.ab.ca or 310-4AUC.

Documents being considered in this proceeding can be found in the eFiling​ System (which requires log in). Once you have logged in, enter 27906 in the “go to” section at the top left corner of your screen.​

Granum Solar Energy Project