Synapse Real Estate Corp has applied to construct and operate a combined-cycle natural gas-fired power plant with a nominal capacity of approximately 1,400 megawatts (MW) as well as 1,800 MW of emergency and backup diesel generation (the power plant). The power plant will not be connected to the Alberta Interconnection Electric System but will be used to power the on-site data centre load. The application has been filed under the Hydro and Electric Energy Act.

The power plant would be located on the northwest and southwest quarters of Section 4, Township 33, Range 1, west of the Fifth Meridian, east of Highway 2A, in the northeast section of the town of Olds.

Hearing information

The Commission issued a notice of hearing for this proceeding; however, it has not determined the full proceeding schedule at this time. The Commission will communicate the details of the hearing at a later date.

To learn more about the review process, or for more information about how you may become involved in this proceeding, please contact us or visit the following webpages:

Register to participate by filing a statement of intent to participate
If you wish to participate in this proceeding, please visit our website and log in to the eFiling System, go to Proceeding 30732, and register to participate under the “registered parties” tab. You will be prompted to fill out a statement of intent to participate. For guidance on how to use the eFiling System, please visit www.auc.ab.ca/how-to-use-efiling. Alternatively, please contact us at 310-4AUC (310-4282) in Alberta or info@auc.ab.ca for more information or assistance with filing your statement of intent to participate.

Statements of intent to participate must include your name, address, phone number, legal land location, description of your land in relation to the proposed development and a description of how you, your land, your business or your activities may be affected by the proposed project. Please also briefly describe the issues you would like the AUC to consider when making its decision.

Only parties that have filed statements of intent to participate and have been granted standing may be eligible for funding and to fully participate in the hearing.

Summarized process schedule

On June 16, 2026, the AUC issued a process schedule update where it suspended the current process steps while the AUC prepares additional information requests for Synapse. Following receipt of responses to these information requests the AUC will communicate the revised process steps.

The eFiling System​

The eFiling System should be accessed to view the applications and the other documents the AUC will be considering in this proceeding. The system is also used to file submissions and evidence to participate in the proceeding.

To create an account, select “New account” and follow the steps to create a user ID and password. If you have any questions about how to use the eFiling System please contact us at info@auc.ab.ca or 310-4AUC.

Documents being considered in this proceeding can be found in the eFiling​ System (which requires log in). Once you have logged in, enter 30732 in the “go to” section at the top left corner of your screen.

Synapse Data Center Power Plant Project