All new electric transmission facilities (with the exception of a small number of projects classified as critical transmission infrastructure) require two separate approvals from the AUC: (i) an approval of the need for new facilities as set out in a needs identification document (NID) filed by the Alberta Electric System Operator (AESO) under the Electric Utilities Act; and (ii) an approval of a facility application for the specific siting or routing of the new facilities, which is made by a transmission facility owner under the Hydro and Electric Energy Act. In a facility application, the Commission considers if approval of the proposed facilities is in the public interest having regard to the project’s social, economic and environmental effects. A facility application may be considered by the Commission in conjunction with a related NID application, or on its own following approval of a NID. Transmission facilities include transmission lines and substations.

The issues typically considered in transmission facility decisions include:

  • Consultation – includes adequacy, scope of consultation with landowners, other interested parties.
  • Property impacts – includes property value, agricultural impacts, business impacts, future development impacts.
  • Health and safety – includes electromagnetic fields (EMF).
  • Routing and siting – includes route development, route/site choice (preferred or alternative), transportation utility corridors, structure choice, construction impacts.
  • Environment – includes wildlife, plants, native prairie, water and water crossings.
  • Electrical effects  includes pipeline interference and mitigation, stray voltage, radio frequency interference.
  • Project cost – includes costs of preferred vs alternative routes.
  • Noise  includes noise impact assessment, post construction monitoring.
  • First Nations – includes consultation, impacts to constitutional rights.
  • Critical transmission infrastructure – whether facilities are critical transmission infrastructure as defined in the legislation.
  • Uncontested – applications with no outstanding objections, or objections were received and the AUC determined that the parties did not meet the test for standing.

Decisions for reference

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.